Monthly Progress Report April 2014 Western I ndonesia National Roads I mprovement Project 39 It is planned so far that there will be three 3 consultant services for: • Capacity Building of Disaster Risks Reduction • Capacity Building for Environmental Management • Capacity Building for Road Safety Draft of the respective Terms of Reference has been being finalized by the Sub-Directorate of Environment and Road Safety outlining the proposed scope activities for the component. During preparation of this Report, the procurement for consultants under this component has not yet been started. Preparation for the procurement would be coordinated by the PMU, the DGH Procurement Team and the CTC.

6.3 Training

6.3.1 Training and Workshop on Anti Corruption and Environmental Mitigations :

There was no training, workshop or seminar conducted by CTC during this month. However , the CTC’s Training Specialist in coordination with Community Development Officer and the Environmental Specialist prepared all the material handouts for the proposed schedule trainingworkshop by the end of next month.

6.3.2 Annual Training Program

 Examining some existing documents and information from previous projects SRRP, DGRI TrainingEIRTP-1, EIRTP-2: TOR, training report, training modules, etc.  Inquiring and asking for clarification concerning various aspects related to training delivery, e.g.: course programs, standard procedures and mechanism of training operation within the CTC WINRIP, target groups and their requirements, etc.  Proposing for adding the position of a sub-professional staff, i.e. Assistant Training Specialist or Training Technician to be included in the Amendment No. 2.  Preparing Summary of Training Program tentative and Training Course Synopsis.  Consulting with relevant Specialists concerning the Course Synopsis to define the important points of contents meeting the project needs and therefore should be included.