Package No.03: Manggopoh – Padang Sawah Package No.04: Ipuh – Bantal

Monthly Progress Report April 2014 Western I ndonesia National Roads I mprovement Project 48 negotiation.The final revision of Larap including signed action under submission process to the World Bank by PMU. Environmental Issues:  CTC need check the recommendation of UKLUPL to field for clearance of environmental issues wich integrate in to the design.

6.6.7 Package No.07: Indrapura – Tapan

Social Issues: CTC received from Balai IIP2JN Padang Larap report of Package no.07Indrapura – Tapanduring on January 2014.Larap report already reviewed by CTC, and Directorate Implementation Region I being send Memo to Balai II. Environmental Issues:  CTC need check the recommendation of AMDAL to field for clearance of environmental issues wich integrate in to the design.  CTC a waiting Amdal documents from the Subdit TLKJAMDAL consultant for submit to the Bank.

6.6.8 Package No.08: Bts Kota Pariaman – Manggopoh

Social Issues: CTC received the LARAP report from Balai II PadangPMU dated 01 August 2013. Review and comment from CTC has been sent to PMU dated 9 September 2013, and PMU has forwarded to P2JNLocal Consultant and requested to revise the LARAP report based on CTC comment. Environmental Issues:  CTC need check the recommendation of AMDAL to field for clearance of environmental issues wich integrate in to the design.

6.6.9 Package No.09: Rantau Tijang – Kota Agung

Social Issues: Balai III will provide a Larap Document for Rantau Tijang – Kota Agung. Environmental Issues:  CTC need check the recommendation of UKLUPL to field for clearance of environmental issues wich integrate in to the design.

6.6.10 Package No.10: Sp. Empat – Air Balam Social Issues:

CTC received the LARAP report from Balai II PadangPMU on 01 August 2013. Review and Monthly Progress Report April 2014 Western I ndonesia National Roads I mprovement Project 49 comment from CTC has been sent to PMU on 9 September 2013, and PMU forwarded to P2JNLocal Consultant and has requested to revise the LARAP report based on CTC comment. Environmental Issues:  CTC need check the recommendation of AMDAL to field for clearance of environmental issues wich integrate in to the design.

6.6.11 Package No.11: Bantal - Mukomuko Social Issues:

CTC received a Larap report of Package no.11 Bantal - Mukomuko from Balai III PalembangPMU dated 7 October 2013. CTC has reviewed to finalize the Larap report during November 2013, and submitted to PMU dated 29 October 2013. The Larap report already submitted to the World Bank by PMU dated 13 November 2103 and approval the World Bank dated 20 November 2013 with some comments. Follow up the World Bank review and PMU letter, now the Larap report is being revisedby CTC. A revision of the Larap report has been submitted to the World Bank dated 9 January 2014 and approval from the WB dated 16 January 2014 with request to provide 1 the Laraps are signed by Local Government, 2 using the form provided in Laraps in the monitoring report, and 3 land appraisal value used as reference for conducting negotiation. The final revision of Larap including signed action under submission process to the World Bank by PMU. Environmental Issues:  CTC need check the recommendation of AMDAL to field for clearance of environmental issues wich integrate in to the design.

6.6.12 Package No12: Kambang – Indrapura Social Issues:

CTC received the LARAP report form Balai II PadangPMU on 01 August 2013. Review and comment from CTC has been sent to PMU on 9 September 2013, and PMU has forwardedto P2JN Local Consultant and requested to revise the LARAP report based on CTC comment. Environmental Issues:  CTC need check the recommendation of AMDAL to field for clearance of environmental issues wich integrate in to the design.  CTC a waiting AMDAL Doc from the Subdit TLKJ AMDAL Consultant

6.6.13 Package No.13: Sp. Rukis – Tj. Kemuning Social Issues:

CTC received a Larap report of Package no.13 Sp.Rukis – Tj.Kemuning from Balai III