Monthly Progress Report April 2014
Western I ndonesia National Roads I mprovement Project 49
comment from CTC has been sent to PMU on 9 September 2013, and PMU forwarded to P2JNLocal Consultant and has requested to revise the LARAP report based on CTC
comment.
Environmental Issues:
CTC need check the recommendation of AMDAL to field for clearance of environmental issues wich integrate in to the design.
6.6.11 Package No.11: Bantal - Mukomuko Social Issues:
CTC received a Larap report of Package no.11 Bantal - Mukomuko from Balai III PalembangPMU dated 7 October 2013. CTC has reviewed to finalize the Larap report
during November 2013, and submitted to PMU dated 29 October 2013. The Larap report already submitted to the World Bank by PMU dated 13 November 2103 and approval the
World Bank dated 20 November 2013 with some comments.
Follow up the World Bank review and PMU letter, now the Larap report is being revisedby CTC. A revision of the Larap report has been submitted to the World Bank dated 9 January
2014 and approval from the WB dated 16 January 2014 with request to provide 1 the Laraps are signed by Local Government, 2 using the form provided in Laraps in the
monitoring report, and 3 land appraisal value used as reference for conducting negotiation. The final revision of Larap including signed action under submission process to the World
Bank by PMU.
Environmental Issues: CTC need check the recommendation of AMDAL to field for clearance of environmental
issues wich integrate in to the design.
6.6.12 Package No12: Kambang – Indrapura Social Issues:
CTC received the LARAP report form Balai II PadangPMU on 01 August 2013. Review and comment from CTC has been sent to PMU on 9 September 2013, and PMU has
forwardedto P2JN Local Consultant and requested to revise the LARAP report based on CTC comment.
Environmental Issues: CTC need check the recommendation of AMDAL to field for clearance of environmental
issues wich integrate in to the design. CTC a waiting AMDAL Doc from the Subdit TLKJ AMDAL Consultant
6.6.13 Package No.13: Sp. Rukis – Tj. Kemuning Social Issues:
CTC received a Larap report of Package no.13 Sp.Rukis – Tj.Kemuning from Balai III
Monthly Progress Report April 2014
Western I ndonesia National Roads I mprovement Project 50
PalembangPMU dated 7 October 2013. CTC has reviewed to finalize the Larap report during November 2013, and submitted to PMU dated 29 October 2013. The Larap report
already submitted to the World Bank from PMU dated 13 November 2103 and approval the World Bank dated 20 November 2013 with some comments.
Follow up the World Bank review and PMU letter, now the Larap report is being revisedby CTC. A revision of the Larap report has been submitted to the World Bank dated 9 January
2014 and approval from the WB dated 16 January 2014 with request to provide 1 the Laraps are signed by Local Government, 2 using the form provided in Laraps in the
monitoring report, and 3 land appraisal value used as reference for conducting negotiation. The final revision of Larap including signed action under submission process to the World
Bank from PMU.
Environmental Issues: CTC need check the recommendation of UKLUPL to field for clearance of
environmental issues wich integrate in to the design.
6.6.14 Package No.14: Painan – Kambang Social Issues:
CTC received from Balai IIP2JN Padang Larap report of Package no.14Painan – Kambangduring on January 2014. Larap report already reviewed by CTC, and Directorate
Implementation Region I is being send Memo to Balai II.
Environmental Issues: CTC need check the recommendation of AMDAL to field for clearance of environmental
issues wich integrate in to the design. CTC a waiting AMDAL Doc from the Subdit TLKJ AMDAL Consultant
6.6.15 Package No.15: Sibolga – Bts. Tapsel Social Issues:
CTC received Final LARAP report form BalaiPMU on 30 September 2013. The report already submitted to the Bank on 22 October 2013 and approved by the Bank on 28 October
2013 with some comments.
Follow up the WorldBank review and PMU letter, now the Larap report is being revisedby CTC. A revision Larap reports has been submitted to the WB dated 30 January 2014 and
approval from the WB dated 6 February 2014.
Environmental Issues: CTC need check the recommendation of UKLUPL to field for clearance of
environmental issues wich integrate in to the design.