Report of LARAP for Sp. Rampa - Poriaha
9. Report of Three 3 LARAPS in West Sumatera
CTC received from Balai II Padang Draft Final of 3 Larap reports in West Sumatera consist Larap report of packages for Kambang - Indrapura, Bts Kota Pariaman – Manggopoh, and SpEmpat – Air Balam dated 01 August 2013. Review and comment from CTC has been sent to PMU dated 9 September 2013, and PMU has forwarded to P2JN Local Consultant with request to revise the LARAP report based on the CTC comment. However, up to the end of April 2014 the revision of the 3 Larap reports has not been received CTC from P2JN. CTC will suggest to PMUDirector of Implementation Affairs Region I to remind P2JNLocal Consultant to provide the revision for 3 three Larap reports.10. Report of Four 4 LARAPS in West Sumatera
CTC received from Balai IIP2JN Padang 4 Larap reports in West Sumatera consist Larap report of packages for Indrapura – Tapan, Painan – Kambang, LubukAlung – Sicincin, and LubukAlung – Kuraitaji during January 2014. CTC has reviewed the 4 Larap reports, and CTC’s comment for the 4 reports in Memo Dinas is being sent to Balai II from Directorate of Implementation Region I. 4.7 Anti Corruption Issues 4.7.1 Anti‐Corruption Action Plan ACAP ACAP for WINRIP was developed from the previous SRIP experiences. Basically, it has the same main components of involving the Community Representative Observers CRO in the bid opening and Third Party Monitoring TPM during the construction supervision although modification was made on the selection process of the CROs for SRIP. Within this plan there are four main pillars as indicated separately below a Community Representative Observers CRO b Publication Disclosure c Complaints Handling System CHS d Third Party Monitoring TPM4.7.2 Community Representative Observers CRO
The Community Representative Observers, required to observe the actual bid opening, were appointed for WP-1 group. All of the CROs were university staff, selected in accordance with the World Bank suggestion to request assistance from local universities. CRO is the independent observer who is not related directly or indirectly to the Contractors, Consultants, and Suppliers or not be part of the WINRIP’s management, and not a member of any political party.Parts
» WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Current Implementation Situation Civil Works
» Disbursement Loan Allocation and Percent Disbursement To Date
» Visit WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Procurement WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Brief Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Project Development WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Procurements WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Quality Assurance WINRIP DOC MPR CTC MPR No.16 2014 04 2014 04 11 00225.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety aspects and Monitoring of Environmental Studies
» Monitoring Report of the Larap for Padang Sawah – Sp. Empat
» Monitoring Report of the LARAP for Manggopoh – Padang Sawah
» Monitoring Report of the LARAP for Ipuh – Bantal
» Monitoring Report of the LARAP for Sp. GunungKemala – PugungTampak
» Report of LARAP for Sp. Rampa - Poriaha
» Report of Five Larap in Bengkulu
» Report of LARAP for Sibolga – BtsTapsel
» Report of Three 3 LARAPS in West Sumatera
» Report of Four 4 LARAPS in West Sumatera
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues .1 Anti‐Corruption Action Plan ACAP
» Complaints Handling Mechanism CHS Third Party Monitoring TPM
» Road Safety Audit Draw‐Downs and Future Costs
» Database Management Information System 1. General Overview
» Financial Management Information System FMIS
» Website Management Information System 1. General Overview
» World Bank Missions Performance Indicators
» Design and Supervision Consultant DSC
» Road Sector Institutional Development
» Training and Workshop on Anti Corruption and Environmental Mitigations :
» Annual Training Program Training
» Anti-Corruption Action Plan ACAP
» Third Party Monitoring TPM Complaint Handling System CHS
» Publication Disclosures Anti‐Corruption Issues
» Problem and Solutions Anti‐Corruption Issues
» No activity done during this month
» Current status of the project for technical field as of 31 April 2014.
» Package No.02: Padang Sawah – SimpangEmpat
» Package No.03: Manggopoh – Padang Sawah Package No.04: Ipuh – Bantal
» Package No.05: Sp. Rampa – Poriaha
» Package No.06: Psr.Pedati – Kerkap
» Package No.07: Indrapura – Tapan
» Package No.08: Bts Kota Pariaman – Manggopoh
» Package No.09: Rantau Tijang – Kota Agung
» Package No.10: Sp. Empat – Air Balam Social Issues:
» Package No.11: Bantal - Mukomuko Social Issues:
» Package No12: Kambang – Indrapura Social Issues:
» Package No.13: Sp. Rukis – Tj. Kemuning Social Issues:
» Package No.14: Painan – Kambang Social Issues:
» Package No.15: Sibolga – Bts. Tapsel Social Issues:
» Package No.18: Mukomuko – Bts. Sumbar Social Issues:
» Package No.21: Lubuk Alung – Kuraitaji Social Issues:
» Disbursement Management Information System
» List of data to be searched Here is a list of data that needed to upload into the WINRIP website.