Background WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
Parts
» WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Background WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Project Development WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Procurements WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Current Overall Situation Environmental and Social Considerations
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety aspects and Monitoring of Environmental Studies
» Monitoring Report of the Larap for Krui - Biha
» Monitoring Report of the Larap for Padang Sawah – Sp. Empat
» Monitoring Report of the LARAP for Manggopoh – Padang Sawah
» Monitoring Report of the LARAP for Ipuh – Bantal
» Monitoring Report of the LARAP for Sp. Gunung Kemala – Pugung Tampak
» Report of LARAP for Sp. Rampa - Poriaha
» Report of Five Larap in Bengkulu
» Report of LARAP for Sibolga – Bts Tapsel
» Report of Three 3 LARAPS in West Sumatera
» Report of Four 4 LARAPS in West Sumatera
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues .1 Anti‐Corruption Action Plan ACAP
» Complaints Handling Mechanism CHS
» Quality Assurance Road Safety Audit
» Draw Downs and Future Costs Disbursement
» General Overview The Management Information System tasks include the following below: Database
» Performance Indicators World Bank and GOI Compliance .1
» Design and Supervision Consultant DSC
» Annual Training Program Training
» Anti-Corruption Action Plan ACAP
» Complaint Handling System CHS
» Publication Disclosures Anti‐Corruption Issues
» Problem and Solutions Anti‐Corruption Issues
» All activities which have undertaken during this month
» Current status of the project for technical field as of 31 March 2014.
» Package No.02: Padang Sawah – Simpang Empat
» Package No.03: Manggopoh – Padang Sawah
» Package No.04: Ipuh – Bantal
» Package No.05: Sp. Rampa – Poriaha
» Package No.06: Psr.Pedati – Kerkap
» Package No.07: Indrapura – Tapan
» Package No.08: Bts Kota Pariaman – Manggopoh
» Package No.09: Rantau Tijang – Kota Agung
» Package No.10: Sp. Empat – Air Balam Social Issues:
» Package No.11: Bantal - Mukomuko Social Issues:
» Package No 12: Kambang – Indrapura Social Issues:
» Package No.13: Sp. Rukis – Tj. Kemuning Social Issues:
» Package No.14: Painan – Kambang Social Issues:
» Package No.15: Sibolga – Bts. Tapsel Social Issues:
» Package No.16: Sebelat – Ipuh Social Issues:
» Package No.19: Lais - Bintunan Social Issues:
» File names composition WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Update into website WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
Show more