Monthly Progress Report March 2014
Western I ndonesia National Roads I mprovement Project 46
6.5 Road Safety Audit
Comment and Recommendation for the DED which were prepared and completed respectively by P2JN or DSC, have been made in response to recommendation of the links
for betterment and their implementation under Annual Works ProgramsAWP-2,3, and consists of Quality Assurance Road Safety Audit of Technical Assistance for National
Highway through site visiting, review of prepared drawing report, had an official meeting with stakeholder which is for Full design review and technical advisory.
The CTC shall compile all the road safety recommendation in the road safety audit reports which shall be part of the technical reports.
Project performance of road safety audit is as following component. •
All activities which have undertaken during this month. -
Post Review, Site Visiting and Full Design Review for the DEDDetailed Engineering Design which is prepared by P2JN and BINTEK.
- Presentation meeting with the P2JN, PPK, BINTEK officials.
- Technical Review and Road Safety Review Report for 7 Packages to Full-Review
and Technical Assistance. -
Technical Advisory for the DED which is 10 Packages prepared by DSC.
• Current status of the project for technical field as of the end of this month.
6.5.1 All activities which have undertaken during this month
Date Activity
From 3 March 2014 To 7 March 2014
Attendance the Meeting for WINRIP technical advisory regarding DED which is 4 packages 781012 of AWP-2 in West Sumatra province, Prepared by DSC, at WINRIP CTC office.
The CTC technical review teamsenior highway engineer, senior road safety auditor, highway engineer attended the meeting with the DSC team on 3th, 5th and 7th March 2014 in order to
discuss finalize about the additional Technical Design Road Safety comment and recommendation which is related with above 4 packages and handed over to the DSC team on 6th
February 2014.
•
Project List for additional Technical Advisory 4 Pacakges in West Sumatra
- No.7 INDRAPURA - TAPAN Link No.019.0, West Sumatra Province
- No.8 BTS.PARIAMAN - MANGGOPOH Link No.024.0 , West Sumatra Province
- No.10 SP.EMPAT – SP.AIR BALAM Link No.034.1 , West Sumatra Province
- No.12 KEMBANG- INDRAPURA Link No.017.2 , West Sumatra Province
From1 March 2014 to 25 March 2014
Final Project Management Manual for RSA which is Chapter 10.11 Road Safety Audit in the WINRIP Project Management Manual: WINRIP Loan IBRD No. 8043-ID.
Final Project Management Manual for RSA which is Chapter 10.11 Road Safety Audit in the WINRIP Project Management Manual has been prepared by senior road safety audit engineer from
1th March to 25th March 2014 in order to be intended as a guide for project management and implementation of the project in aspect of road safey audit.
The final Project Management Manual which is Chapter 10.11 Road Safety Audit in the WINRIP Project Management Manual: WINRIP Loan IBRD No. 8043-ID has been submitted on 25th March
2014.
Monthly Progress Report March 2014
Western I ndonesia National Roads I mprovement Project 47
Date Activity
From18 March 2014 to 19 March 2014
Attendance the Meeting for PMM Project Management Manual : WINRIP Loan IBRD No. 8043-ID. at the hotel Ambarah, from 18
th
to 19
t
March 2014.
The CTC technical review teamsenior highway engineer, senior road safety auditor, highway engineer attended the meeting with the PU staffs on 18th March and 19th March 2014 in order to
discuss finalize about the Project Management Manual with the charging staffs in the PU each field in order to reflect the latest guideline, manual and methodology to implement the project.
From 17 March 2014 To 27 March 2014
Final Technical Advisory for DED which is 1 packages of AWP-2 in Bengkulu province in order to finalize technical quality review to the design preparation by DSC Attendance the
Meeting for WINRIP, at WINRIP CTC office. Final Design Technical Review of 1 package which is WINRIP AWP-3 in Bengkulu province has
carried out by the CTC technical review teamsenior highway engineer, senior road safety auditor, highway engineer in order to assess and finalize the technical quality review to the design
preparation which has prepared by DSC team, in response to recommendation of the links for betterment and their implementation under third year Annual Works Program AWP-3, and consists