CTC received from Balai IIP2JN Padang Larap report of Package no.14 Painan – Kambangduring on January 2014. Larap report already reviewed by CTC, and Directorate Implementation Region I is being send Memo to Balai II. Environmental Issues: Now CTC is waiting for and ensure the environmental safeguard for this package from Balai II PadangSubdit EA DTA.6.6.15 Package No.15: Sibolga – Bts. Tapsel Social Issues:
CTC received Final LARAP report form BalaiPMU on 30 September 2013. The report already submitted to the Bank on 22 October 2013 and approved by the Bank on 28 October 2013 with some comments. Follow up the World Bank review and PMU letter, now the Larap report is being revised by CTC. A revision Larap reports has been submitted to the WB dated 30 January 2014 and approval from the WB dated 6 February 2014. Environmental Issues: The UKLUPL has been sent to the Bank on 30 September 20136.6.16 Package No.16: Sebelat – Ipuh Social Issues:
CTC received a Larap report of Package no.16 Sebelat - Ipuh from Balai III PalembangPMU dated 7 October 2013. CTC has reviewed to finalize the Larap report during November 2013, and submitted to PMU dated 29 October 2013. The Larap report already submitted to the World Bank by PMU dated 13 November 2103 and approval the World Bank dated 20 November 2013 with some comments. Follow up the World Bank review and PMU letter, now the Larap report is being revised by CTC. A revision of the Larap report has been submitted to the World Bank dated 9 Jan 2014 and approval from the WB dated 16 Jan 2014 with request to provide 1 the Laraps are signed by Local Government, 2 using the form provided in Laraps in the monitoring report, and 3 land appraisal value used as reference for conducting negotiation. The final revision of Larap including signed action under submission process to the World Bank from PMU.Parts
» WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Background WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Project Development WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Procurements WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Current Overall Situation Environmental and Social Considerations
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety aspects and Monitoring of Environmental Studies
» Monitoring Report of the Larap for Krui - Biha
» Monitoring Report of the Larap for Padang Sawah – Sp. Empat
» Monitoring Report of the LARAP for Manggopoh – Padang Sawah
» Monitoring Report of the LARAP for Ipuh – Bantal
» Monitoring Report of the LARAP for Sp. Gunung Kemala – Pugung Tampak
» Report of LARAP for Sp. Rampa - Poriaha
» Report of Five Larap in Bengkulu
» Report of LARAP for Sibolga – Bts Tapsel
» Report of Three 3 LARAPS in West Sumatera
» Report of Four 4 LARAPS in West Sumatera
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues .1 Anti‐Corruption Action Plan ACAP
» Complaints Handling Mechanism CHS
» Quality Assurance Road Safety Audit
» Draw Downs and Future Costs Disbursement
» General Overview The Management Information System tasks include the following below: Database
» Performance Indicators World Bank and GOI Compliance .1
» Design and Supervision Consultant DSC
» Annual Training Program Training
» Anti-Corruption Action Plan ACAP
» Complaint Handling System CHS
» Publication Disclosures Anti‐Corruption Issues
» Problem and Solutions Anti‐Corruption Issues
» All activities which have undertaken during this month
» Current status of the project for technical field as of 31 March 2014.
» Package No.02: Padang Sawah – Simpang Empat
» Package No.03: Manggopoh – Padang Sawah
» Package No.04: Ipuh – Bantal
» Package No.05: Sp. Rampa – Poriaha
» Package No.06: Psr.Pedati – Kerkap
» Package No.07: Indrapura – Tapan
» Package No.08: Bts Kota Pariaman – Manggopoh
» Package No.09: Rantau Tijang – Kota Agung
» Package No.10: Sp. Empat – Air Balam Social Issues:
» Package No.11: Bantal - Mukomuko Social Issues:
» Package No 12: Kambang – Indrapura Social Issues:
» Package No.13: Sp. Rukis – Tj. Kemuning Social Issues:
» Package No.14: Painan – Kambang Social Issues:
» Package No.15: Sibolga – Bts. Tapsel Social Issues:
» Package No.16: Sebelat – Ipuh Social Issues:
» Package No.19: Lais - Bintunan Social Issues:
» File names composition WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Update into website WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.