Monthly Progress Report March 2014
Western I ndonesia National Roads I mprovement Project 25
inventory table do not show the situasion. According to world bank letter, PMU via Ref. 1476Bp.11MD2013 dated 27 November 2013
Sumaterahas requested the Director of Implementation Affairs Region I via the SatkerPPK to prepare the addresed above.
A revision for five Larap reports had been submitted to the World Bank on 9 January 2014, and PMU had been received some comments from WB 16 January 2014. All of the Bank’s
request will be provided by PMU on the Larap monitoring report. Final revision for five Larap reports including the signed action plan is under submission to the World Bank.PMU now
waiting Larap implementation report from Head of Satker I and II Bengkulu Province.
8. Report of LARAP for Sibolga – Bts Tapsel
CTC received Draft Final Larap report for Sibolga – Bts Tapsel from Balai dated 30 September 2013. The Larap report already submitted to the world Bank from PMU dated 22
October 2013, and approval the world bank dated 28 October 2013.
Larap report for Sibolga – Bts Tapsel in North Sumatera Province has reviewed by the World Bank Ref.WINRIP140 dated 28 October 2013 and need revision as follows:
a. There are some renters will be affected by the project which is also categorized as project affected people so must be recorded in the affected people list.
b. There is a private grave will be affected by the project which eligible to get moving cost and ritual ceremony cost.
c. There are 64 units of kiosks occupied side drain need to be displaced which get moving assistance in addition the compensation provided for their affected assets.
According to World Bank letter, PMU Ref. 1404Bp.11MD2013 dated 31October 2013 has requested the Director of Implementation Affairs Region I via the SatkerPPK to prepare the
addressed above.
A revision Larap reports had been submitted to the WB dated 30January 2014, and approval from the World Bank dated 6 February 2014. PMU now waiting Larap implementation report
from Head of Satker North Sumatra Province.
9. Report of Three 3 LARAPS in West Sumatera
CTC received from Balai II Padang Draft Final of 3 Larap reports in West Sumatera consist Larap report of packages for Kambang - Indrapura, Bts Kota Pariaman – Manggopoh, and
Sp Empat – Air Balam dated 01 August 2013. Review and comment from CTC has been sent to PMU dated 9 September 2013, and PMU has forwarded to P2JN Local Consultant
with request to revise the LARAP report based on the CTC comment. However up to the end of December 2013 the revision of the 3 Larap reports has not been received CTC. CTC
will suggest to PMUDirector of Implementation Affairs Region I to remind P2JNLocal Consultant to provide the revision for 3 three Larap reports.