Social Issues: CTC received the LARAP report from Balai II PadangPMU dated 01 August 2013. Review and comment from CTC has been sent to PMU dated 9 September 2013, and PMU has forwarded to P2JNLocal Consultant and requested to revise the LARAP report based on CTC comment. Environmental Issues: Official Letter from Director of Implementation Affairs Region I has been issued to Kepala Balai Besar Pelaksanaan Jalan Nasional II dated 17 December 2013 regarding to the request of the AMDAL submission. Then on 27 December 2013 AMDAL document already sent to Director of Implementation Affairs Region I by Official Letter from Kepala Balai Besar Pelaksanaan Jalan Nasional II. Status of AMDAL study for this package on process for environmental permit by the Governor of West Sumatera Province.6.6.9 Package No.09: Rantau Tijang – Kota Agung
Social Issues: Balai III will provide a Larap Document for Rantau Tijang – Kota Agung. Environmental Issues: The environmental safeguard or UKL UPL has completed and will be sent to the WB after DGH send formal letter to the WB that no change link for this package.6.6.10 Package No.10: Sp. Empat – Air Balam Social Issues:
CTC received the LARAP report from Balai II PadangPMU on 01 August 2013. Review and comment from CTC has been sent to PMU on 9 September 2013, and PMU forwarded to P2JNLocal Consultant and has requested to revise the LARAP report based on CTC comment. Environmental Issues: Official Letter from Director of Implementation Affairs Region I has been issued to Kepala Balai Besar Pelaksanaan Jalan Nasional II dated 17 December 2013 regarding to the request of the AMDAL submission. Then on 27 December 2013 AMDAL document already sent to Director of Implementation Affairs Region I by Official Letter from Kepala Balai Besar Pelaksanaan Jalan Nasional II. Status of AMDAL study for this package on process for environmental permit by the Governor of West Sumatera Province.Parts
» WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Background WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Project Development WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Procurements WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Current Overall Situation Environmental and Social Considerations
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety aspects and Monitoring of Environmental Studies
» Monitoring Report of the Larap for Krui - Biha
» Monitoring Report of the Larap for Padang Sawah – Sp. Empat
» Monitoring Report of the LARAP for Manggopoh – Padang Sawah
» Monitoring Report of the LARAP for Ipuh – Bantal
» Monitoring Report of the LARAP for Sp. Gunung Kemala – Pugung Tampak
» Report of LARAP for Sp. Rampa - Poriaha
» Report of Five Larap in Bengkulu
» Report of LARAP for Sibolga – Bts Tapsel
» Report of Three 3 LARAPS in West Sumatera
» Report of Four 4 LARAPS in West Sumatera
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues .1 Anti‐Corruption Action Plan ACAP
» Complaints Handling Mechanism CHS
» Quality Assurance Road Safety Audit
» Draw Downs and Future Costs Disbursement
» General Overview The Management Information System tasks include the following below: Database
» Performance Indicators World Bank and GOI Compliance .1
» Design and Supervision Consultant DSC
» Annual Training Program Training
» Anti-Corruption Action Plan ACAP
» Complaint Handling System CHS
» Publication Disclosures Anti‐Corruption Issues
» Problem and Solutions Anti‐Corruption Issues
» All activities which have undertaken during this month
» Current status of the project for technical field as of 31 March 2014.
» Package No.02: Padang Sawah – Simpang Empat
» Package No.03: Manggopoh – Padang Sawah
» Package No.04: Ipuh – Bantal
» Package No.05: Sp. Rampa – Poriaha
» Package No.06: Psr.Pedati – Kerkap
» Package No.07: Indrapura – Tapan
» Package No.08: Bts Kota Pariaman – Manggopoh
» Package No.09: Rantau Tijang – Kota Agung
» Package No.10: Sp. Empat – Air Balam Social Issues:
» Package No.11: Bantal - Mukomuko Social Issues:
» Package No 12: Kambang – Indrapura Social Issues:
» Package No.13: Sp. Rukis – Tj. Kemuning Social Issues:
» Package No.14: Painan – Kambang Social Issues:
» Package No.15: Sibolga – Bts. Tapsel Social Issues:
» Package No.16: Sebelat – Ipuh Social Issues:
» Package No.19: Lais - Bintunan Social Issues:
» File names composition WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Update into website WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.