Publication Disclosures Anti‐Corruption Issues
6.4.7. Action Plan for Next Months
The Activities plan for future months of 2014, in order of priority are as follows: 1. Helping the Company PT. Perentjana Djaja to prepare the draft of the Technical Justification for additional financing on the implementation of the Anti-Corruption Action Plan ACAP components in Amendment 2 of CTC Contract. 2. Reporting the Minutes of Selection of the TPM which was conducted by interviewing the TPM candidates and evaluating the proposals from the prospective TPM. 3. Carrying out the preparatory training to the elected TPM, which will be followed also by the related project implementer components PIU, PPK, Supervision Consultant DSC, and Contractor. 4. Provision Decree of the Director of Planning, Directorate General of Highways concerning Establishment of Third Party Monitoring for four packages of AWP-1 WINRIP. 5. Preparing Letter of Employment Agreement between the TPM of four packages of AWP- 1 with CTC WINRIP on behalf of PMU WINRIP. 6. Inputting or upload the data, documents and reports of CROs and TPM into the website. 7. Disseminate of Anti-Corruption Action Plan to all stakeholders who associated with the WINRIP project through the PMM training. 8. Conducting socialization of CRO selection for the packets that will immediately be conducted the procurement of construction services, especially for Procurement Committee of North Sumatra province Balai BPJN I Medan, for package 17: Simpang Rampa - Poriaha and package 15: Sibolga – Batas Tapanuli selatan. Note: For activities point 3, 4 and 5 are dependent upon the amendment 2 of CTC contract, related to the availability of funds for the implementation of ACAP components, especially for the delivery of CRO and TPM.Parts
» WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Background WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Project Development WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Procurements WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Current Overall Situation Environmental and Social Considerations
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety aspects and Monitoring of Environmental Studies
» Monitoring Report of the Larap for Krui - Biha
» Monitoring Report of the Larap for Padang Sawah – Sp. Empat
» Monitoring Report of the LARAP for Manggopoh – Padang Sawah
» Monitoring Report of the LARAP for Ipuh – Bantal
» Monitoring Report of the LARAP for Sp. Gunung Kemala – Pugung Tampak
» Report of LARAP for Sp. Rampa - Poriaha
» Report of Five Larap in Bengkulu
» Report of LARAP for Sibolga – Bts Tapsel
» Report of Three 3 LARAPS in West Sumatera
» Report of Four 4 LARAPS in West Sumatera
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues .1 Anti‐Corruption Action Plan ACAP
» Complaints Handling Mechanism CHS
» Quality Assurance Road Safety Audit
» Draw Downs and Future Costs Disbursement
» General Overview The Management Information System tasks include the following below: Database
» Performance Indicators World Bank and GOI Compliance .1
» Design and Supervision Consultant DSC
» Annual Training Program Training
» Anti-Corruption Action Plan ACAP
» Complaint Handling System CHS
» Publication Disclosures Anti‐Corruption Issues
» Problem and Solutions Anti‐Corruption Issues
» All activities which have undertaken during this month
» Current status of the project for technical field as of 31 March 2014.
» Package No.02: Padang Sawah – Simpang Empat
» Package No.03: Manggopoh – Padang Sawah
» Package No.04: Ipuh – Bantal
» Package No.05: Sp. Rampa – Poriaha
» Package No.06: Psr.Pedati – Kerkap
» Package No.07: Indrapura – Tapan
» Package No.08: Bts Kota Pariaman – Manggopoh
» Package No.09: Rantau Tijang – Kota Agung
» Package No.10: Sp. Empat – Air Balam Social Issues:
» Package No.11: Bantal - Mukomuko Social Issues:
» Package No 12: Kambang – Indrapura Social Issues:
» Package No.13: Sp. Rukis – Tj. Kemuning Social Issues:
» Package No.14: Painan – Kambang Social Issues:
» Package No.15: Sibolga – Bts. Tapsel Social Issues:
» Package No.16: Sebelat – Ipuh Social Issues:
» Package No.19: Lais - Bintunan Social Issues:
» File names composition WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.
» Update into website WINRIP DOC MPR CTC MPR No.15 2014 03 2014 03 10 00225.