Monthly Progress Report March 2014
Western I ndonesia National Roads I mprovement Project 38
• Workshop for Updating PMM
• Meeting with Pokja Bengkulu Package No. 11 and 13
• Meeting with World Bank WINRIP Coordination
The following table summarized the CTC personnel field activities during March 2014.
. Date
Position Destination
Purpose
2-3 March Community
Development Officer Bengkulu
Socialization Third Party Monitoring
4-5 March Senior
Procurement Specialist
Procurement Specialist 2
Bengkulu
Finalization of PQ Result Report by Pokja for Package No. 11 : Ipuh -
Bantal
5-6 March Community
Development Officer Environmental
Specialist Highway Engineer
Ass
Community Development Officer
Lampung Interview Third Party Monitoring
TPM
10-11 March Community
Development Specialist
Ass. Community
Development Officer
Bengkulu Interview Third Party Monitoring
TPM
11-14 March Social
Impact Specialist
Lampung Monitoring LARAP Package No.17 Sp.
Kemala-Pg. Tampak, Lampung Province
6.2.2 Design and Supervision Consultant DSC
The Design and Supervision Consultant DSC will be responsible for design of WP 2 and WP 3 civil works and supervision of all civil works. They will have the role of ‘Engineer’ under
a FIDIC-type contract. The tasks include the preparation and maintenance of a quality assurance plan, validation and updating of designs, supervision of all civil works,
environmental and social monitoring and management, and support for financial and progress monitoring and reporting.
The DSC will also be responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as
documentation and reporting based on the financial management plan. They will prepare a Quality Assurance system covering all subprojects, and continuously monitor the
effectiveness of their supervision procedures. The team will be contracted and managed by DGH through the Bina Marga Regional Office Balai II, and will be based in Padang, West
Sumatera.
DSC contract was negotiated in Balai Besar Pelaksanaan Jalan Nasional II Balai-II of DGH. The negotiation result and draft contract have been sent to WB on 25 March 2013 for
review and approval. The Bank issued no objection letter on the negotiation results and draft contract with letter dated 19 April 2013.