Disbursement WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.

Monthly Progress Report August 2014 Western I ndonesia National Roads I mprovement Project 4 Draft Bidding Documents for International Competitive Bidding ICB were concurred by the World Bank on August 6, 2014 with issuance of No Objection Letter NOL to issue the bidding documents to the prequalified applicants. Invitation To Bid was issued to the three 3 prequalified interested bidders on August 22, 2014 followed by issuance of bidding documents. As of the writing, the contract package is still currently under tendering period with pre- bid conferencemeeting scheduled to be held on September 8, 2014 and to be followed by actual site visit. Barring any unforeseen circumstances which will cause interruption during the bidding period, the submission and opening of bids is schedule to take place on October 3, 2014. 3. Package 13 Sp. Rukis Tj. Kemuning AWP-2 Ten 10 interested applicant bidders have submitted their prequalification documents and out of the 10 who submitted the PQ document, 3 applicants were prequalified and Invitation To Bid were issued to submit tenders for the execution of the Works. Following are the three 3 qualified applicant bidders who were issued an Invitation To Bid : 1. PT. Waskita Karya Persero, Tbk 2. PT. Hutama Karya Persero PT. Conbloc Infratecno Joint Operation 3. Halla Corporation Korea Co. in joint venture with PT. Daya Mulia Turangga. Draft Bidding Documents for International Competitive Bidding ICB were concurred by the World Bank on August 6, 2014 with issuance of No Objection Letter NOL to issue the bidding documents to the prequalified applicants. Invitation To Bid was issued to the three 3 prequalified interested bidders on August 22, 2014 followed by issuance of bidding documents. As of this writing, the contract package is still currently under tendering period with pre- bid conferencemeeting scheduled to be held on September 8, 2014 and to be followed by actual site visit. Barring any unforeseen circumstances which will cause interruption during the bidding period, the submission and opening of bids is schedule to take place on October 3, 2014. 4. Packages 5 Simpang Rampa Poriaha There were 14 Fourteen contractor applicants 13 single company and I joint venture operation who submitted their prequalification documents. Three 3 contractor applicants failed to prequalify due to failure to satisfy the qualification criteria. Likewise, the II Eleven contractors who passed the qualification criteria were issued an Invitation To Bid to submit their respective tenders for the execution of the Works. Following are the eleven 11 prequalified applicant bidders who were invited to submit their bids : 1. PT. Adhi Karya Persero, Tbk Indonesia 2. PT. Bangun Cipta Kontraktor Indonesia 3. PT. Brantas Abipraya Persero Indonesia 4. PT. Hutama Karya Persero PT. Seneca Indonesia JO Indonesia Monthly Progress Report August 2014 Western I ndonesia National Roads I mprovement Project 5 5. PT. Multi Structure Indonesia 6. PT. Nindya Karya Persero Indonesia 7. PT. Nusa Konstruksi Enjiniring, Tbk Indonesia 8. PT. Pembangunan Perusahaan Persero Indonesia 9. PT. Waskita Karya Persero, Tbk Indonesia 10. PT. WIdya Sapta Colas Indonesia 11. PT. Yasa Patria Perkasa Indonesia Invitation To Bid was issued on August 12, 2014 to the eleven 11 prequalified contractors followed by the issuance of bidding documents. Pre-bid conference was held in Medan on August 21, 2014 and followed by site visit. Submission of bids is scheduled on September 22, 2014 and immediately thereafter bids will be opened after the closing time.

1.5 Consolidated Update of the Progress of the Project

Other brief updates of the pre-construction activities of this reporting month are shown in Table 1.1.