Progress TRAINING TO SUPPORT PROJECT IMPLEMENTATION
6.4.3 Third Party Monitoring TPM
The ACAP activities during August 2014 were continued for provision Decree of the Director of Planning, Directorate General of Highways concerning Establishment of Third Party Monitoring for four packages 01, 02, 03 and 04 of AWP-1 WINRIP, and Preparing Letter of Employment Agreement between the TPM of four packages of AWP-1 with CTC WINRIP on behalf of PMU WINRIP. The Progress of Third Party Monitoring TPM Activities from April 2013 up to August 2014 and the works plan are shown in Appendix H2.6.4.4 Complaint Handling System CHS
The Community Development Officer with collaboration with MIS Specialist has developed a software application of Complaint Handling System CHS in integrated to website of WINRIP http:www.winrip-ibrd.com. In the implementation of Complaint Handling System CHS essentially there are five 5 main components as follows: • Data Entry. • Complaint Registration. • Complaint Assessment. • Field Clarification and Analysis. • Problem Solving and taking the Decision The final draft of Complaint Handling System the framework of the complaint procedures on the web site of WINRIP and provided ACAP inputting data in the web site is ready to be operated. However these applications still continue to be refined by considering input from various parties. The CHS team has been monitored and noted the public complaints via SiPP website and WINRIP website, but until now have no complaint about the WINRIP programs. The CHS Activities is shown in Appendix H3. 6.4.5. Publication Disclosures Publication and disclosure is an attempt to increase transparency of information to the public, soParts
» WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Current Implementation Situation WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Disbursement WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Visit Procurement WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» 5.98 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» 13.85 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» 7.01 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» - 14.36 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Action Plan ACAP
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues
» Road Safety Audit WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» General Overview Management Information System
» Database Management Information System
» World Bank Missions World Bank and GOI Compliance
» Design and Supervision Consultant DSC
» Road Sector Institutional Development
» Updating the Project Management Manual PMM
» Annual Training Program TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Progress TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Activities Plan for next month September 2014
» Complaint Handling System CHS
» Activities During This Month August 2014
» Package No.01: Krui Biha Social Issues: Package No.02: Padang Sawah Simpang Empat
» Package No.03: Manggopoh Padang Sawah Package No.04: Ipuh Bantal
» Package No.05: Sp. Rampa Poriaha Package No.06: Psr.Pedati Kerkap
» Package No.07: Indrapura Tapan
» Package No.10: Sp. Empat Air Balam Social Issues: Package No.11: Bantal - Mukomuko Social Issues:
» Package No.16: Sebelat Ipuh Social Issues:
» Package No.19: Lais - Bintunan Social Issues: Package No.20: Lubuk Alung Sicincin Social Issues:
» Synchronizing Data of The FMIS Application 1 Background
» Draw Downs and Future Costs Disbursement Quality Assurance
» Project Risks and Mitigation Measures
Show more