Monitoring Report of the LARAP Package No.17
21. Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
Province : Sumatera Barat A. Previous Status : • CTC received the Draft Final LARAP documents from Balai IIP2JN on January 2014 • After CTC s review of the documents, comments were transmitted in the form of a MEMO DINAS to Balai II thru the Directorate of Implementation in Region I. B. Pending Issues, Concern and Actions a Revised LARAP documents under preparation by SATKER for final review prior to submission to World Bank. C. Update during this reporting month of August 2014 a No update this month4.7 Anti Corruption Issues
4.7.1 Anti Corruption Action Plan ACAP
ACAP for WINRIP was developed from the previous SRIP experiences. Basically, it has the same main components of involving the Community Representative Observers CRO in the bid opening and Third Party Monitoring TPM during the construction supervision although modification was made on the selection process of the CROs for SRIP. Within this plan there are four main pillars as indicated separately below a Community Representative Observers CRO b Publication Disclosure c Complaints Handling System CHS d Third Party Monitoring TPM4.7.2 Community Representative Observers CRO
The Community Representative Observers, required to observe the actual bid opening, were appointed for WP-1 group. All of the CROs were university staff, selected in accordance with the World Bank suggestion to request assistance from local universities. CRO is the independent observer who is not related directly or indirectly to the Contractors, Consultants, and Suppliers or not be part of the WINRIP s management, and not a member of any political party. CROs selection procedures: a. Review the criteria and qualifications of candidates for the CRO. b. Director of Planning, DGH as Chairman of the Project Management Unit, delegated of the authority to the selection of the CRO to the Head of National Roads Implementation AgencyParts
» WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Current Implementation Situation WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Disbursement WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Visit Procurement WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» 5.98 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» 13.85 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» 7.01 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» - 14.36 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Action Plan ACAP
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues
» Road Safety Audit WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» General Overview Management Information System
» Database Management Information System
» World Bank Missions World Bank and GOI Compliance
» Design and Supervision Consultant DSC
» Road Sector Institutional Development
» Updating the Project Management Manual PMM
» Annual Training Program TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Progress TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Activities Plan for next month September 2014
» Complaint Handling System CHS
» Activities During This Month August 2014
» Package No.01: Krui Biha Social Issues: Package No.02: Padang Sawah Simpang Empat
» Package No.03: Manggopoh Padang Sawah Package No.04: Ipuh Bantal
» Package No.05: Sp. Rampa Poriaha Package No.06: Psr.Pedati Kerkap
» Package No.07: Indrapura Tapan
» Package No.10: Sp. Empat Air Balam Social Issues: Package No.11: Bantal - Mukomuko Social Issues:
» Package No.16: Sebelat Ipuh Social Issues:
» Package No.19: Lais - Bintunan Social Issues: Package No.20: Lubuk Alung Sicincin Social Issues:
» Synchronizing Data of The FMIS Application 1 Background
» Draw Downs and Future Costs Disbursement Quality Assurance
» Project Risks and Mitigation Measures
Show more