4.6 Environmental and Social Considerations
4.6.1 Current Overall Situation
A project category is assigned to each package as either Category A, B or C depending on the likely degree of influence on environmental issues with a brief explanation as follows: Category A project is one which will have a significant negative impact on the environment and may have an influence on areas outside the actual project area. A project classified as such requires an AMDAL ANDAL, RKLRPL study. Category B project is one which affects the people or the environment to some extent but with a smaller impact than a Category A. The required environmental analysis is a UKLUPL study only. Category C project has minimal effect on the people or environment and an environmental analysis is not required. SPPL are used to handle any minor problem which may arise. All the twenty one 21 packages require environmental impact investigations. There are a total of fourty one 41 studies required, twenty 20 for environmental impact investigations and twenty one 21 for social studies. The twenty 20 environmental studies need the approval of the Environmental Agency BLH with five 5 of the studies AMDALEIA to be approved by World Bank WB. While the twenty one 21 social studies SLARAP and LARAP require the approval of World Bank prior to implementation. As of end of this reporting period August 2014, nineteen 19 environmental impact studies has been approved by BLH, while all of the five 5 studies that requires World Bank approval, Bank already issued No Objection Letter NOL. The remaining one 1 environmental impact studies UKL- UPL for Packages No. 4 Ipuh-Bantal is currently under preparation. For the social studies , twelve 12 of the twenty one 21 studies were already given No Objection Letter from the World Bank WB. Details of sub-projects that require environmental and social safeguards and progress are shown in Appendix E. Presented below in a tabulated format is the current status of the environmental and social studies. Works Program No of Packages No of Investigations Approval by Remarks BLH World Bank AWP-1 4 11 AMDAL x 1 UKLUPL x 2 SPPL x 4 Full LARAP x 4 1 AMDAL 1 UKLUPL 4 SPPL 1 EIA, NOL Issued by WB 4 Full LARAP Approved NOL issued by WB LARAP and AMDAL paket 117, except for SPPL AWP-2 9 17 4 UKLUPL 1 Simple 1 one Study AMDALParts
» WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Current Implementation Situation WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Disbursement WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Visit Procurement WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Project Development WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Project Objective WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Procurements WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» 5.98 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» 13.85 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» 7.01 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» - 14.36 WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Quality Assurance WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 2
» Monitoring Report of the LARAP Package No. 3
» Monitoring Report of the LARAP Package No. 4
» Monitoring Report of the LARAP Package No. 5
» Monitoring Report of the LARAP Package No. 6
» Monitoring Report of the LARAP Package No. 7
» Monitoring Report of the LARAP Package No. 8
» Monitoring Report of the LARAP Package No. 9
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No.17
» Monitoring Report of the LARAP Package No.18
» Monitoring Report of the LARAP Package No.19
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Anti Corruption Action Plan ACAP
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues
» Road Safety Audit WINRIP DOC MPR CTC MPR No.20 2014 08 2014 08 11 00224.
» General Overview Management Information System
» Database Management Information System
» World Bank Missions World Bank and GOI Compliance
» Design and Supervision Consultant DSC
» Road Sector Institutional Development
» Updating the Project Management Manual PMM
» Annual Training Program TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Progress TRAINING TO SUPPORT PROJECT IMPLEMENTATION
» Activities Plan for next month September 2014
» Complaint Handling System CHS
» Activities During This Month August 2014
» Package No.01: Krui Biha Social Issues: Package No.02: Padang Sawah Simpang Empat
» Package No.03: Manggopoh Padang Sawah Package No.04: Ipuh Bantal
» Package No.05: Sp. Rampa Poriaha Package No.06: Psr.Pedati Kerkap
» Package No.07: Indrapura Tapan
» Package No.10: Sp. Empat Air Balam Social Issues: Package No.11: Bantal - Mukomuko Social Issues:
» Package No.16: Sebelat Ipuh Social Issues:
» Package No.19: Lais - Bintunan Social Issues: Package No.20: Lubuk Alung Sicincin Social Issues:
» Synchronizing Data of The FMIS Application 1 Background
» Draw Downs and Future Costs Disbursement Quality Assurance
» Project Risks and Mitigation Measures
Show more