Detailed Design Preparation Procurements

Monthly Progress Report May 2014 Western I ndonesia National Roads I mprovement Project 19 Table 4.1 Program Contract Package Contractor Name of Road Province Contract Signed Notice to Proceed Contract Time AWP-1 1 Jaya Konstruksi Manggala Pratama Tbk Biha - Krui Lampung Nov 25, 2013 Jan 8, 2014 640 CD 2 Jaya Konstruksi Manggala Pratama Tbk Padang Sawah – Sp. Empat including Air Gadang West Sumatera Dec 6, 2013 Jan 6, 2014 730 CD 3 Jaya Konstruksi Manggala Pratama Tbk Manggopoh – Padang Sawah West Sumatera Dec 6, 2013 Jan 6, 2014 730 CD 4 PT. Waskita Karya and PT. Mulya Turangga JO Ipuh - Bantal Bengkulu Nov 14, 2013 Jan 10, 2014 730 CD

4.4 Civil Works Progress

As of the end of this reporting month, all the 4 contractors are still in the process of mobilization. Other activities done during this month were setting up of laboratory testing building, staking out and repair and restoration of deteriorated existing pavements, roadway excavation, embankment formation, construction of stone masonry side ditches and other minor works. Progress status of the four 4 on-going civil work contract as of this reporting period are shown in Table 4.2. Table 4.2 Program Contract Package Contractor Name of Road Target Progress Schedule Ending May 2014 Actual Progress Accomplis hed Slippage AWP-1 1 Jaya Konstruksi Manggala Pratama Tbk Biha - Krui

11.11 2.93

- 8.12 2 Jaya Konstruksi Manggala Pratama Tbk Padang Sawah – Sp.Empat incl.Air Gadang Brd

7.17 3.85

- 3.32 3 Jaya Konstruksi Manggala Pratama Tbk Manggopo h – Padang Sawah

4.37 2.78

- 1.59 4 PT. Waskita Karya and PT. Mulya Turangga JO Ipuh - Bantal

6.03 0.56

- 5.47 Monthly Progress Report May 2014 Western I ndonesia National Roads I mprovement Project 20 It is to note that Contract Package No. 1 Biha – Krui is currently at an alarming stage with respect to work progress due to the considerable negative slippage -8,12 as of and of May 2014 At the rate the Contractor execute the works, it is expected that by next month the delay will slip further to the -10 mark if no realistic action plan or catch up schedule is implemented. It is presumed that the Design Supervision Consultant have done a concrete action to address the Contractor’s progress problem. CTC drew the attention of DSC concerning what remedial measures to be imposed in the coming month in order to catch up with the schedule. CTC requested copy of any action plan agreed, but up to this writing, DSC never replied to CTC’s communication. For Contract Package No.4 Ipuh – Bantal, there was a big increase in the negative slippage of -5,47 as compared with a negligible delay of -0,61 in the previous month. To catch up with the schedule, a show-cause meeting attended by representatives from DSC, Contractors and the Implementing Agency was held, mainly to address the Contractor’s progress schedule. As the accumulated delay is still in the manageable level, CTC suggested that the action plans proposed by the Contractors during Show Cause Meeting SCM shall be strictly implemented and closely monitored by the DSC Field Team with actual implementation report and progress be copied to this office. As the Contractors were still in the mobilization stage, most of the delay incurred were attributed to difficulty in locating suitable base camps and quarry sites of unlimited quantities. For contract packages under AWP-2 and AWP-3 which have a combined total of 17 packages, a brief summary of the actual activities and status as of this reporting period are presented in Table 1.1, page 5 of this Report.

4.5 Quality Assurance

The DSC will be responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as documentation and reporting based on the financial management plan. They will prepare a Quality Assurance system covering all subprojects, and continuously monitor the effectiveness of their supervision procedures. The Draft Final Quality Assurance Manual had been submitted on May 5, 2014 by CTC to PMU for further review and approval. Likewise, a copy of the Draft Final Quality Assurance manual was furnished to the Design Supervision Consultant for provisional reference for quality requirements of the projects.