Package No.01: Krui – Biha Package No.02: Padang Sawah – Simpang Empat

Monthly Progress Report May 2014 Western I ndonesia National Roads I mprovement Project 55 for review and for submission to World Bank. Environmental Issues:  CTC need to check the recommendations of UKLUPL in the field for clearance of environmental issues which will be integrated in to the design.

6.6.7 Package No.07: Indrapura – Tapan

Social Issues:  Corrected LARAP documents still to be submitted for final review prior to submission to World Bank. Environmental Issues:  CTC need to check the recommendation of AMDAL in the field for clearance of environmental issues which will be integrated in to the design.  CTC is waiting AMDAL documents from the Subdit TLKJAMDAL local consultant hired by BALAI for submission to the Bank.

6.6.8 Package No.08: Bts Kota Pariaman – Manggopoh

Social Issues:  To date May 2014 the revised LARAP documents have not yet been resubmitted by P2JN Local Consultant  CTC to suggest to PMUDirectorate of Implementation Affairs Region 1 to issue follow-up letter to P2JNLocal Consultant requesting that the documents must be resubmitted as soon as possible Environmental Issues:  CTC need to check the recommendations of AMDAL in the field for clearance of environmental issues which will be integrated in to the design.

6.6.9 Package No.09: Rantau Tijang – Kota Agung

Social Issues:  Still no issues and concerns. Environmental Issues:  CTC need to check the recommendations of UKLUPL is the field for clearance of environmental issues which will be integrated in to the design.

6.6.10 Package No.10: Sp. Empat – Air Balam Social Issues:

 To date May 2014 the revised LARAP documents have not yet been resubmitted by P2JN Local Consultant. Monthly Progress Report May 2014 Western I ndonesia National Roads I mprovement Project 56  CTC to suggest to PMUDirectorate of Implementation Affairs Region 1 to issue follow-up letter to P2JNLocal Consultant requesting that the documents must be resubmitted as soon as possible. Environmental Issues:  CTC need to check the recommendations of AMDAL in the field for clearance of environmental issues which will be integrated in to the design.

6.6.11 Package No.11: Bantal - Mukomuko Social Issues:

 Monitoring Reports of the LARAP’s implementation have to be prepared and submitted for review and for submission to World Bank. Environmental Issues:  CTC need to check the recommendations of AMDAL in the field for clearance of environmental issues which will be integrated in to the design.

6.6.12 Package No12: Kambang – Indrapura Social Issues:

 To date May 2014 the revised LARAP documents have not yet been resubmitted by P2JN Local Consultant  CTC to suggest to PMUDirectorate of Implementation Affairs Region 1 to issue follow-up letter to P2JNLocal Consultant requesting that the documents must be resubmitted as soon as possible Environmental Issues:  CTC need tocheck the recommendations of AMDAL in the field for clearance of environmental issues which integrated in to the design.  CTC is waiting AMDAL Doc from the Subdit TLKJ AMDAL Consultant.

6.6.13 Package No.13: Sp. Rukis – Tj. Kemuning Social Issues:

 Monitoring Reports of the LARAP’s implementation have to be prepared and submitted for review and for submission to World Bank. Environmental Issues:  CTC need to check the recommendations of UKLUPL in the field for clearance of environmental issues which will be integrated in to the design.

6.6.14 Package No.14: Painan – Kambang Social Issues:

 Corrected LARAP documents still to be submitted for final review prior to submission to World Bank