6.3 Training
6.3.1 Training and Workshop on Anti Corruption and Environmental Mitigations :
The work during this reporting month has been focused on the following activities:6.3.1 Updating the Project Management Manual PMM
♦ While waiting for approval of the updated document of Project Management Manual PMM which was submitted to the PMU the end of last month 30 th April 2014, some additional suggestion have been received for further improving updating the PMM. These are the results of discussions with the Resource Person which still have to be continued for more crucial matters and important subjecttopics especially relating to specification. ♦ All additional suggestions for such correctionmodification have been included in the document properly. The PMM document have been updated perfectly and completely, ready for final checking and approval. ♦ The PMU has planned to conduct a workshop for final checking and approval of the PMM this coming month. ♦ Assisting the PMU in preparing the workshops. Some chapters of the PMM have been copied for being checked and approved by the members of PMM Updating Work Unit or Kelompok Kerja Pokja Pemutakhiran PMM established through the decree of the Director of Planning, Directorate General of Highways Decree no. 0152Bp.11KPTS2014 dated 11 March 2014.6.3.2 Annual Training Program
Preparing the implementation of urgently required two types of training, i.e. Training on Work Plan for Environmental Management and Monitoring or Rencana Kerja Pengelolaan dan Pemantauan Lingkungan RKPPL Training and Training on Third Party Monitoring TPM Training. These are two special short courses, one day each, beyond the regular training course, for responding to the instruction of the Bank Mission that is included in their draft Aide-Memoire being discussed in the Wrap-up Meeting on Monday, 19 May 2014. At the beginning, the first RKPPL Training is scheduled to be delivered on 5 June 2014 in Padang, the second: 10 June 2014 in Lampung, and the third: 17 June 2014 in Bengkulu. While the TPM Training will be on: 6 June 2014 in Padang, 11 June 2014 in Lampung, and 18 June 2014 in Bengkulu. However, there will be other activities of the Directorate of RegionalParts
» WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Current Implementation Situation Civil Works
» Disbursement Loan Allocation and Percent Disbursement To Date
» Visit A World Bank mission started with kick-off meeting in DGH on 28 April 2014 and continued
» Procurement WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Project Development WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation Procurements
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 2.93 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 3.85 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 2.78 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 0.56 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Quality Assurance WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Current Overall Situation Environmental and Social Considerations
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 2 : Padang Sawah – Sp. Empat
» Monitoring Report of the LARAP Package No. 7 : Indrapura - Tapan
» Monitoring Report of the LARAP Package No. 8 : Bts. Pariaman - Manggopoh
» Monitoring Report of the LARAP Package No. 9 : Rantau Tijang – Kota Agung
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat – Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No. 13 : Sp. Rukis – Tj. Kemuning
» Monitoring Report of the LARAP Package No.18 : Mukomuko – Bts. Sumbar
» Monitoring Report of the LARAP Package No.19 : Lais - Bintunan
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues .1 Anti‐Corruption Action Plan ACAP
» Complaints Handling Mechanism CHS
» Road Safety Audit WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Database Management Information System 1. General Overview
» Financial Management Information System FMIS
» Website Management Information System 1. General Overview
» Agreed Key Actions and Mission Plans
» Performance Indicators World Bank and GOI Compliance .1
» Design and Supervision Consultant DSC
» Road Sector Institutional Development
» Training and Workshop on Anti Corruption and Environmental Mitigations :
» Updating the Project Management Manual PMM
» Annual Training Program Training
» Anti-Corruption Action Plan ACAP
» Complaint Handling System CHS
» Publication Disclosures Anti‐Corruption Issues
» Problem and Solutions Anti‐Corruption Issues
» Package No.01: Krui – Biha Package No.02: Padang Sawah – Simpang Empat
» Package No.03: Manggopoh – Padang Sawah Package No.04: Ipuh – Bantal
» Package No.05: Sp. Rampa – Poriaha Package No.06: Psr.Pedati – Kerkap
» Package No.09: Rantau Tijang – Kota Agung Package No.10: Sp. Empat – Air Balam Social Issues:
» Package No.15: Sibolga – Bts. Tapsel Social Issues: Package No.16: Sebelat – Ipuh Social Issues:
» WINRIP Leaflet Management Information System
» General information of the WINRIP project, ie the total cost of the project,
» The WINRIP objectives, which contains a general purpose of the WINRIP
» The main components, which consists of 4 main components Component
Show more