Visit A World Bank mission started with kick-off meeting in DGH on 28 April 2014 and continued
Monthly Progress Report May 2014
Western I ndonesia National Roads I mprovement Project 5
Consolidated Project Status As Of End May 2014 Table 1.1
Length Width
Estimated Cost PIP Mar
2012 Excl. VAT
DED Technical
Design Review
Road Safety Audit
Km m
IDR Milion Status
Doc Requirement
Status Doc Requirement
Status Budget
Allocation Status
Est’d. Start
Duration Months
1 Krui - Bha
25 7
146,668.00 Completed
Completed Completed
SPPL AMDAL No.1 17
SPPL OK P2JN 2010 AMDAL
Subdit TLKJ OK 2012
1.LARAP 2.Lap.Mon
LARAP 1.NOL WB 4 Jan
13 2.NOL WB Satker PJN
Prop 98
Completed Jan-14
24.00 A
Padang Sawah - Sp. Ampat 40.9
7 Including Air Gadang Bridge
100 m 7
3 Manggopoh - Padang Sawah
32 7
152,434.90 Completed
Completed Completed
SPPL OK P2JN 2010
1.LARAP 2.Monit. LARAP
Report 1.NOL WB 13 Dec
12 2.Process Dinas PU Prop
99 Completed
Jan-14 24.00
A 4
Ipuh - Bantal 42.4
7 226,275.10
Completed Completed
Completed SPPL
UKLUPL SPPL OK P2JN
2010 UKL?UPL under
preparation by local consultant
1.LARAP 2.Monit. LARAP
Report 1.NOL WB 10 Dec
12 2.Completed APBNSAL201
3 100
Completed Jan-14
24.00 A
5 Sp. Rampa - Poriaha
11.1 6
55,126.60 Completed
Completed Completed
UKLUPL OK Balai 1
2011 1.SLARAP
2.LARAP monit Report
1.Nol WB 10 Dec 12 2.relocation 1
kiosk affected project w ill be
done paralel construction
Balai 1 On Going
Des-13 18.00
B 6
Ps. Pedati - Kerkap 25
7 72,018.80
Completed Completed
Completed UKLUPL
OK TLKJ 2011 1.SLARAP
2.LARAP monit Report
1.NOL WB 20 Nov 2013 2.
Target of Larap Implementation is
August 2014 Balai 3
Inventory Stage of
PAP Not Yet Started
Apr-14 18.00
D 7
Indrapura - Tapan 19.5
7 96,921.00
Completed Completed
Completed AMDAL
OK TLKJ 2014 SLARAP
Target July 2014 Balai 2
Staking Out Not Yet Started
feb-15 21.00
E 8
Bts. Kota Pariaman - Manggopoh 46.8
7 183,268.80
Completed Completed
Completed AMDAL
OK TLKJ 2013 LARAP
Target LARAP July 2014
Balai 2 Target Mon:
Oct 2014 Not Yet Started
Dec-14 24.00
E 9
Rantau Tijang - Kota Agung 42
7 149,831.50
UKLUPL OK TLKJ 2011
LARAP Being prepared
by Consultant recuirement Balai
3 APBN
2016 Not Yet Started
Jul-15 21.00
C 10
Sp. Empat - Sp. Air Balam 61.7
7 241,617.20
Completed Completed
Completed AMDAL
OK TLKJ 2013 LARAP
Target July 2014 Balai 2
Target Mon: Oct 2014
Not Yet Started Dec-14
24.00 E
11 Bantal - Mukomuko
50.1 6
157,820.00 Completed
Completed Completed
AMDAL OK TLKJ 2014
1.LARAP 2.LARAP monit
Report 1.Nol WB :20 Nov
2013 2.Target August
2014 Balai 3
10 On Going
Apr-14 24.00
B 12
Kambang - Indrapura 55.2
6 171,948.00
Completed Completed
Completed AMDAL
OK TLKJ 2014 SLARAP
Target July 2014 Balai 2
Staking Out Not Yet Started
feb-15 24.00
E 13
Sp. Rukis - Tj.Kemuning 56.3
7 225,481.50
Completed Completed
Completed UKLUPL
OK P2JN 2011 1.LARAP
2.LARAP monit Report
1.NOL WB:20 Nov 2013
2.Target Dec 2014
Balai 3 Inventory
On Going Apr-14
21.00 B
14 Painan - Kambang
31.5 7
118,993.00 On Going
AMDAL OK TLKJ 2014
SLARAP Consultant
recuirement Balai 2
Balai 2 Staking Out
Not Yet Started Jul-15
21.00 G
15 Sibolga - Bts.Tap Sel
36 7
129,228.00 Completed
Completed Completed
UKLUPL OK Balai 1
2011 1.LARAP
2.LARAP monit Report
1.NOL WB:5Feb 2014
2.Target Dec 2014
Balai 1 Inventory
Not Yet Started Apr-14
21.00 D
Seblat - Ipuh including 34.5
6 Air Lalang Air Guntung Bridge
64 m 6
36.8 6
30 m 6
18 Mukomuko - Bts.Sumbar
25.8 6
69,233.00 UKLUPL
OK TLKJ 2011 SLARAP
Being prepared by Consultant
recuirement Balai 3
Balai 3 Staking Out
Not Yet Started Oct-15
18.00 C
19 Lais - Bintuan
11.6 7
37,558.00 Completed
Completed Completed
UKLUPL OK TLKJ 2011
1.LARAP 2.LARAP monit
Report 1.Nol WB :20 Nov
2013 2.Target August
2014 Balai 3
Inventory Not Yet Started
Oct-15 18.00
D 20
Lubuk Alung - Sicincin 14.6
7 54,557.00
On Going UKLUPL
OK TLKJ 2011 SLARAP
Revision by Consultant
recuirement Balai 2
Balai 2 Staking Out
Not Yet Started Oct-15
18.00 F
21 Lubuk Alung - Kurajati
16.8 7
65,788.00 On Going
UKLUPL OK TLKJ 2011
SLARAP Revision by
Consultant recuirement Balai
2 Balai 2
Staking Out Not Yet Started
Oct-15 18.00
F 2,776,633.60
Remarks : A
On going Construction =
3 Packages in 1 study AMDAL West Sumatera Province B
Application Evaluation Report AER for submission to WB C
Detailed Engineering Design Still to be prepared =
2 Packages in 1 study AMDAL Bengkulu Province D
Procurement Preparation Underway - Standar Bidding Documents SBD and Owners Estimate OE core underfine finalization. E