Monitoring Report of the LARAP Package No. 9 : Rantau Tijang – Kota Agung
14. Monitoring Report of the LARAP Package No. 14 : Painan - Kambang
Province : Sumatera Barat A. Previous Status : • CTC received the Draft Final LARAP documents from Balai IIP2JN on January 2014 • After CTC’s review of the documents, comments were transmitted in the form of a MEMO DINAS to Balai II thru the Directorate of Implementation in Region I. B. Pending Issues, Concern and Actions a Corrected LARAP documents still to be submitted for final review prior to submission to World Bank. C. Update during this reporting month of May 2014 a No update during this period15. Monitoring Report of the LARAP Package No. 15 : Sibolga – Bts. Tapsel
Province : Sumatera Utara A. Previous Status : • CTC received the Draft Final LARAP documents on September 30,2013 from Balai. • PMU submitted the documents to World Bank on October 28, 2013 requesting further review and acceptance. • On October 28, 2013, World Bank returned to PMU the documents with comments to be considered in finalizing the documents for resubmission. • On October 31, 2013, PMU requested the Director of Implementation Affairs thru SatkerPPK to address the World Bank comments • Revised LARAP documents was resubmitted to World Bank on January 30, 2014 • World Bank approved the LARAP documents on February 6, 2014 for implementation in acquiring Road Light of Ways and removal of obstruction. • PPKSatker and the Local Government started the preparation stage of land acquisition B. Pending Issues, Concern and Actions a LARAP implementation under preparation stage by SATKERPPK. C. Update during this reporting month of May 2014 a No update this monthParts
» WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Current Implementation Situation Civil Works
» Disbursement Loan Allocation and Percent Disbursement To Date
» Visit A World Bank mission started with kick-off meeting in DGH on 28 April 2014 and continued
» Procurement WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Project Development WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation Procurements
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 2.93 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 3.85 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 2.78 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 0.56 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Quality Assurance WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Current Overall Situation Environmental and Social Considerations
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 2 : Padang Sawah – Sp. Empat
» Monitoring Report of the LARAP Package No. 7 : Indrapura - Tapan
» Monitoring Report of the LARAP Package No. 8 : Bts. Pariaman - Manggopoh
» Monitoring Report of the LARAP Package No. 9 : Rantau Tijang – Kota Agung
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat – Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No. 13 : Sp. Rukis – Tj. Kemuning
» Monitoring Report of the LARAP Package No.18 : Mukomuko – Bts. Sumbar
» Monitoring Report of the LARAP Package No.19 : Lais - Bintunan
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues .1 Anti‐Corruption Action Plan ACAP
» Complaints Handling Mechanism CHS
» Road Safety Audit WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Database Management Information System 1. General Overview
» Financial Management Information System FMIS
» Website Management Information System 1. General Overview
» Agreed Key Actions and Mission Plans
» Performance Indicators World Bank and GOI Compliance .1
» Design and Supervision Consultant DSC
» Road Sector Institutional Development
» Training and Workshop on Anti Corruption and Environmental Mitigations :
» Updating the Project Management Manual PMM
» Annual Training Program Training
» Anti-Corruption Action Plan ACAP
» Complaint Handling System CHS
» Publication Disclosures Anti‐Corruption Issues
» Problem and Solutions Anti‐Corruption Issues
» Package No.01: Krui – Biha Package No.02: Padang Sawah – Simpang Empat
» Package No.03: Manggopoh – Padang Sawah Package No.04: Ipuh – Bantal
» Package No.05: Sp. Rampa – Poriaha Package No.06: Psr.Pedati – Kerkap
» Package No.09: Rantau Tijang – Kota Agung Package No.10: Sp. Empat – Air Balam Social Issues:
» Package No.15: Sibolga – Bts. Tapsel Social Issues: Package No.16: Sebelat – Ipuh Social Issues:
» WINRIP Leaflet Management Information System
» General information of the WINRIP project, ie the total cost of the project,
» The WINRIP objectives, which contains a general purpose of the WINRIP
» The main components, which consists of 4 main components Component
Show more