Road Safety Audit WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.

Monthly Progress Report May 2014 Western I ndonesia National Roads I mprovement Project 38 d. Develop and update a Geographic Information System GIS of spatial and roads information that overlay into Google Maps. e. Develop and manage a Project Progress Monitoring System PPMS, the web based application to monitoring physical progress. f. Provide a Complaint Handling System CHS, used and support the ACAP activities to accommodate complaints from the public via sms gateway, email and website. 2 Data Collection and Document Upload a. Collecting data and updating list of data catalog every month. b. Uploading documents into a file storage server. 3 Technical and Computer Troubleshooting a. Setting up and manage cable network of local area network and internet connection. b. Setting up and manage hardware problem of the computer, printer, copier and phone. c. Software installation and cleaning up of computer virus.

5.3.2. Database

Incoming and Outgoing Data Administrator Saved Stored Inputted File Storage Server Shelves Database Application Soft File Hard Copy Data Information Typical Workflow of Database Management A typical workflow in management of incoming and outgoing data is divided into 3 types of data handling, below: 1. Hardcopy, the document is stored in a rack. 2. Soft files, saved in the File Storage Server. 3. Data information, inputted in database applications. For further handling that needs to be made an integrated database management system so that all data can be stored properly. The database system has been prepared to store all of WINRIP project information in a systematic, easily traceable, maintainable, and manageable format as outlined below with the following systems: a. File Storage Server, used to stored all files of reports and other documents. Please check the URL address http:storage.winrip-ibrd.com. b. Letter Database System, used to record all information of incoming and outgoing letter. Monthly Progress Report May 2014 Western I ndonesia National Roads I mprovement Project 39 c. Document Library System, used to record all information of hard copy documents then store it into library shelves. Following further review the sub folder server file system has been amended to accommodate the needs of the professional staff as follows: CODE ROOT 1 st FOLDER 2 nd FOLDER 01 01_Project_Document 01_01 01_01_PIP 01_02 01_02_Loan_Agreement 01_03 01_03_Loan_Agreement_Extention 01_04 01_04_PAD 01_05 01_05_PMM 01_06 10_06_Aide_Memoire 02 02_General_Contract 02_01 02_01_Pre-contract 02_02 02_02_Contract 02_03 02_03_Mobilization 02_04 02_04_Amendment 02_05 02_05_Addendum 02_06 02_06_MOA 03 03_General_Report 03_01 03_01_Inception_Report 03_02 03_02_Monthly_Progress_Report 03_03 03_03_IFR 03_04 03_04_IFR_Q 03_05 03_05_Procurement_Committee_Readin ess_ Assessment_Report 03_06 03_06_Bid_Evaluation_Procurement_Rep ort 03_07 03_07_Draft_Project_Completion_Report 03_08 03_08_Project_Completion_Report 03_09 03_09_Technical_Report 04_01 04_General_Letter 05 05_General_Document ation 05_01 05_01_Meeting 05_02 05_02_Workshop 05_03 05_03_Training 05_04 05_04_Site_Visit 06 06_Office_Manager 06_01 06_01_Document 06_02 06_02_Operational