2.78 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
4.6 Environmental and Social Considerations
4.6.1 Current Overall Situation
A project category is assigned to each package as either Category A, B or C depending on the likely degree of influence on environmental issues with a brief explanation as follows : Category A project is one which will have a significant negative impact on the environment and may have an influence on areas outside the actual project area. A project classified as such requires an AMDAL ANDAL, RKLRPL study. Category B project is one which affects the people or the environment to some extent but with a smaller impact than a Category A. The required environmental analysis is a UKLUPL study only. Category C project has minimal effect on the people or environment and an environmental analysis is not required. SPPL or Standard operational procedures SOP or SKPPL are used to handle any minor problem which may arise. Details of packages that require environmental and social safeguard are given in Appendix E and the following table provides a summary of the work involved in the 21 WINRIP packages. All the 21 packages require environmental impact investigation. All 39 studies 18 environmental studies need approval by Environmental Agency BLH. And 21 social studies SLARAP and LARAP require the approval of the World Bank. Up to the end of May 2014 17of 18 packages 90 has received BLH approval then the current have 12 of 21social studies or 57 has received approval from the World Bank. Works Program No of Packages No of Investigations Approval by Remarks BLH World Bank AWP-1 4 8 AMDAL x 1 UKLUPL x 2 SPPL x 4 Full LARAP x 4 1 AMDAL 1 UKLUPL 4 SPPL 4 Full LARAP Approved – NOL issued by WB LARAP and AMDAL paket 117, except for SPPL AWP-2 8 17 AMDAL Study x 4 UKLUPL x 4 Simple LARAP x 1 Full LARAP x 8 4 UKLUPL 4 AMDAL 1 SLARAP 1 one Study AMDAL for threes packages, are Packages No.7, 12 and 14 packages on AWP2 AWP3. 1 one Study AMDAL for two packages, are Packages No.11 16. packages on AWP2 AWP3. AWP-3 9 14 Full LARAPx 8 AMDAL Study x AMDAL OK = paket No.1 17 AWP1 2 Full LARAP Approved – NOL issued by WB include AMDAL except forParts
» WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Current Implementation Situation Civil Works
» Disbursement Loan Allocation and Percent Disbursement To Date
» Visit A World Bank mission started with kick-off meeting in DGH on 28 April 2014 and continued
» Procurement WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Project Development WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation Procurements
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 2.93 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 3.85 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 2.78 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 0.56 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Quality Assurance WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Current Overall Situation Environmental and Social Considerations
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 2 : Padang Sawah – Sp. Empat
» Monitoring Report of the LARAP Package No. 7 : Indrapura - Tapan
» Monitoring Report of the LARAP Package No. 8 : Bts. Pariaman - Manggopoh
» Monitoring Report of the LARAP Package No. 9 : Rantau Tijang – Kota Agung
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat – Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No. 13 : Sp. Rukis – Tj. Kemuning
» Monitoring Report of the LARAP Package No.18 : Mukomuko – Bts. Sumbar
» Monitoring Report of the LARAP Package No.19 : Lais - Bintunan
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues .1 Anti‐Corruption Action Plan ACAP
» Complaints Handling Mechanism CHS
» Road Safety Audit WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Database Management Information System 1. General Overview
» Financial Management Information System FMIS
» Website Management Information System 1. General Overview
» Agreed Key Actions and Mission Plans
» Performance Indicators World Bank and GOI Compliance .1
» Design and Supervision Consultant DSC
» Road Sector Institutional Development
» Training and Workshop on Anti Corruption and Environmental Mitigations :
» Updating the Project Management Manual PMM
» Annual Training Program Training
» Anti-Corruption Action Plan ACAP
» Complaint Handling System CHS
» Publication Disclosures Anti‐Corruption Issues
» Problem and Solutions Anti‐Corruption Issues
» Package No.01: Krui – Biha Package No.02: Padang Sawah – Simpang Empat
» Package No.03: Manggopoh – Padang Sawah Package No.04: Ipuh – Bantal
» Package No.05: Sp. Rampa – Poriaha Package No.06: Psr.Pedati – Kerkap
» Package No.09: Rantau Tijang – Kota Agung Package No.10: Sp. Empat – Air Balam Social Issues:
» Package No.15: Sibolga – Bts. Tapsel Social Issues: Package No.16: Sebelat – Ipuh Social Issues:
» WINRIP Leaflet Management Information System
» General information of the WINRIP project, ie the total cost of the project,
» The WINRIP objectives, which contains a general purpose of the WINRIP
» The main components, which consists of 4 main components Component