Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
16. Monitoring Report of the LARAP Package No.16 : Seblat - Ipuh
Province : Bengkulu A. Previous Status : • September 30, 2013, CTC received the LARAP documents from BBPJN III Palembang. • After CTC’s review, PMU forwarded the documents to World Bank on November 13, 2013 requesting for No Objection Letter NOL. • Bank conducted their review and their comments were relayed to PMU thru letter on November 20, 2013. • On November 27, 2013, the World Bank sent letter to the Director of Planning to request the Director of Implementation Affairs thru SatkerPPK to revise the LARAP documents by incorporating their comments. • PMU resubmitted to the World Bank on January 9, 2014 the revised LARAP documents and was resubmitted again on May 21, 2014 due to some minor corrections. B. Pending Issues, Concern and Actions a Monitoring Reports of the LARAP’s implementation have to be prepared and submitted for review and for submission to World Bank. b LARAP documents for this Package No.16 covers only land acquisition for the road link. If there are land acquisition for the bridge site, a separate LARAP documents need to be prepared. C. Update during this reporting month of May 2014 a Just before the end of this reporting month, on May 30, 2014, the World Bank interpose No Objection to the revised LARAP documents for implementation.17. Monitoring Report of the LARAP Package No.17 : Sp. Gunung Kemala – Pg. Tampak
Province : Lampung A. Previous Status : • Comments on LARAP documents by the World Bank was forwarded to PMU on September 16, 2013 • World Bank issued letter on September 23, 2013 to the Director of Implementation Affairs Region I thru SatkerPPK to incorporate their comments on the LARAP documents. • CTC revised the LARAP documents taking into consideration all the Bank’s comments and PMU resubmitted the documents to the World Bank on November 6, 2013 • World Bank approved the corrected documents on November 12, 2013 • Director of Planning issued letter on November 18, 2013 to the Director of Implementation Affairs to inform that World Bank had already approved the LARAP documents for implementation by the land acquisition committee.Parts
» WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Current Implementation Situation Civil Works
» Disbursement Loan Allocation and Percent Disbursement To Date
» Visit A World Bank mission started with kick-off meeting in DGH on 28 April 2014 and continued
» Procurement WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Project Development WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation Procurements
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 2.93 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 3.85 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 2.78 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 0.56 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Quality Assurance WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Current Overall Situation Environmental and Social Considerations
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 2 : Padang Sawah – Sp. Empat
» Monitoring Report of the LARAP Package No. 7 : Indrapura - Tapan
» Monitoring Report of the LARAP Package No. 8 : Bts. Pariaman - Manggopoh
» Monitoring Report of the LARAP Package No. 9 : Rantau Tijang – Kota Agung
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat – Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No. 13 : Sp. Rukis – Tj. Kemuning
» Monitoring Report of the LARAP Package No.18 : Mukomuko – Bts. Sumbar
» Monitoring Report of the LARAP Package No.19 : Lais - Bintunan
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues .1 Anti‐Corruption Action Plan ACAP
» Complaints Handling Mechanism CHS
» Road Safety Audit WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Database Management Information System 1. General Overview
» Financial Management Information System FMIS
» Website Management Information System 1. General Overview
» Agreed Key Actions and Mission Plans
» Performance Indicators World Bank and GOI Compliance .1
» Design and Supervision Consultant DSC
» Road Sector Institutional Development
» Training and Workshop on Anti Corruption and Environmental Mitigations :
» Updating the Project Management Manual PMM
» Annual Training Program Training
» Anti-Corruption Action Plan ACAP
» Complaint Handling System CHS
» Publication Disclosures Anti‐Corruption Issues
» Problem and Solutions Anti‐Corruption Issues
» Package No.01: Krui – Biha Package No.02: Padang Sawah – Simpang Empat
» Package No.03: Manggopoh – Padang Sawah Package No.04: Ipuh – Bantal
» Package No.05: Sp. Rampa – Poriaha Package No.06: Psr.Pedati – Kerkap
» Package No.09: Rantau Tijang – Kota Agung Package No.10: Sp. Empat – Air Balam Social Issues:
» Package No.15: Sibolga – Bts. Tapsel Social Issues: Package No.16: Sebelat – Ipuh Social Issues:
» WINRIP Leaflet Management Information System
» General information of the WINRIP project, ie the total cost of the project,
» The WINRIP objectives, which contains a general purpose of the WINRIP
» The main components, which consists of 4 main components Component
Show more