Monitoring of Environmental Aspects During Construction
3. Monitoring Report of the LARAP Package No. 3 : Manggopoh – Padang Sawah
Province : Sumatera Barat A. Previous Status : • LARAP documents approved by World Bank on January 4, 2013 • Monitoring Report approved by World Bank on April 18, 2013 • CTC received proof of compensation payments for five 5 of the affected persons out of the remaining fifteen 15 persons and Monitoring Report was submitted to World Bank on February 28, 2014. B. Pending Issues, Concerns and Actions a Documents for compensation payments for the ten 10 remaining affected persons being processed by the Local Government. b Monitoring Report concerning compensation payments to the ten 10 remaining affected persons still to be prepared for submission to World Bank. C. Update during this reporting month of May 2014 a On-going construction b Processing of documents for the 10 remaining affected persons were withheld by the Local Government as these 10 persons could not be located in their addresses shown in the LARAP. c Local Government has paid 67 new additional Project Affected Persons for compensation of additional road right of ways for roadway cut sections to attain the required cut slope of 1:1. d Monitoring Report for the additional land acquisition is under preparation by CTC for submission to World Bank by next month.4. Monitoring Report of the LARAP Package No. 4 : Ipuh – Bantal
Province : Bengkulu A. Previous Status : • LARAP documents approved by World Bank on December 10, 2012 • CTC received proof of payments for 157 affected persons out of the 227 Project Affected Persons. • Monitoring Report was submitted by PMU to World Bank on December 24, 2013 • World Bank transmitted their comments on the Monitoring Report to PMU on January 6, 2014. • For the remaining 70 affected persons, Local Government settled their compensation payments in January 2014 and February 2014. • Monitoring Report for the compensation of the remaining 70 affected persons was submitted by PMU to the World Bank on February 28, 2014. • World Bank sent letter to PMU on March 5, 2014 informing that the Bank have no further comment on the Monitoring Report. B. Pending Issues, Concern and Actions a No more pending issues and concerns.Parts
» WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Current Implementation Situation Civil Works
» Disbursement Loan Allocation and Percent Disbursement To Date
» Visit A World Bank mission started with kick-off meeting in DGH on 28 April 2014 and continued
» Procurement WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Consolidated Update of the Progress of the Project
» Background WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Project Development WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Scope of Services CTC Consultants
» CTC Contract CTC Consultants
» DSC Consultants WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Technical Assistance for Capacity Building for Disaster Risks Reduction
» Technical Assistance for Capacity Building for Environmental Management
» Technical Assistance for Capacity Building for Road Safety
» Detailed Design Preparation Procurements
» Civil Works Implementation WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Civil Works Progress WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 2.93 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 3.85 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 2.78 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» 0.56 WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Quality Assurance WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Current Overall Situation Environmental and Social Considerations
» Monitoring of Environmental Aspects During Construction
» Design Integration, Road Safety aspects and Monitoring of Environmental Studies
» Monitoring Report of the LARAP Package No. 2 : Padang Sawah – Sp. Empat
» Monitoring Report of the LARAP Package No. 7 : Indrapura - Tapan
» Monitoring Report of the LARAP Package No. 8 : Bts. Pariaman - Manggopoh
» Monitoring Report of the LARAP Package No. 9 : Rantau Tijang – Kota Agung
» Monitoring Report of the LARAP Package No. 10 : Sp. Empat – Sp. Air Balam
» Monitoring Report of the LARAP Package No. 11 : Bantal - Mukomuko
» Monitoring Report of the LARAP Package No. 12 : Kambang - Indrapura
» Monitoring Report of the LARAP Package No. 13 : Sp. Rukis – Tj. Kemuning
» Monitoring Report of the LARAP Package No.18 : Mukomuko – Bts. Sumbar
» Monitoring Report of the LARAP Package No.19 : Lais - Bintunan
» Monitoring Report of the LARAP Package No. 20 : Lubuk Alung - Sicincin
» Monitoring Report of the LARAP Package No. 21 : Lubuk Alung - Kurataji
» Community Representative Observers CRO
» Publication Disclosure Anti Corruption Issues .1 Anti‐Corruption Action Plan ACAP
» Complaints Handling Mechanism CHS
» Road Safety Audit WINRIP DOC MPR CTC MPR No.17 2014 05 2014 05 09 00225.
» Database Management Information System 1. General Overview
» Financial Management Information System FMIS
» Website Management Information System 1. General Overview
» Agreed Key Actions and Mission Plans
» Performance Indicators World Bank and GOI Compliance .1
» Design and Supervision Consultant DSC
» Road Sector Institutional Development
» Training and Workshop on Anti Corruption and Environmental Mitigations :
» Updating the Project Management Manual PMM
» Annual Training Program Training
» Anti-Corruption Action Plan ACAP
» Complaint Handling System CHS
» Publication Disclosures Anti‐Corruption Issues
» Problem and Solutions Anti‐Corruption Issues
» Package No.01: Krui – Biha Package No.02: Padang Sawah – Simpang Empat
» Package No.03: Manggopoh – Padang Sawah Package No.04: Ipuh – Bantal
» Package No.05: Sp. Rampa – Poriaha Package No.06: Psr.Pedati – Kerkap
» Package No.09: Rantau Tijang – Kota Agung Package No.10: Sp. Empat – Air Balam Social Issues:
» Package No.15: Sibolga – Bts. Tapsel Social Issues: Package No.16: Sebelat – Ipuh Social Issues:
» WINRIP Leaflet Management Information System
» General information of the WINRIP project, ie the total cost of the project,
» The WINRIP objectives, which contains a general purpose of the WINRIP
» The main components, which consists of 4 main components Component
Show more