optimalisasi dan Pengembangan aset

Analisa Pembahasan Manajemen Management Discussion Analysis PT Pelabuhan Indonesia IV Persero Laporan Tahunan 2015 Annual Report 38 dikerjasamakan pelabuhan umum lainnya seperti pelabuhan tanjung batu; b. Melakukan penetrasi dan pengembangan pasar petikemas dan special cargo curah cair dan curah kering, telah diusulkan Pelimpahan Kewenangan Penyelenggaraan Pemanduan di Perairan Wajib Pandu Lubuk Tutung - Sangatta berdasarkan Surat Direktur Utama Pelindo-4 kepada Ditjenhub. Laut Kemenhub No. 14 KB.0011DUT-2014, tanggal 17 September 2014; c. Untuk pengembangan produk barujasa baru logistic support, ICD, Property di Pelabuhan Bitung IHP telah disusun hasil kajian Konsultan PT Matra Perdana Satria; sedangkan pengembangan Pelabuhan Manado MMB dalam kajian oleh pihak konsultan, Pengembangan Pelabuhan Balikpapan telah ditanda-tangani MoU dengan PT Sugico Graha No. 20HK3022 DKP-2013, tanggal 30 Oktober 2013;dan untuk Pengembangan Pelabuhan Samarinda, Direksi telah menyampaikan suratnya kepada Walikota Samarinda No. 06PR.102IDOT-2014, tanggal 19 Februari 2014,tentang Persetujuan dan Rekomendasi Rencana Induk Pelabuhan dan Pengembangan SMBC; d. Untuk pengoperasian CCC dan CDC pada Cabang Bitung telah terbit Peraturan Direksi No. PD 22 Tahun 2012, tentang Sistem dan Prosedur pelayanan Cargo Consolidation Center CCC atau Cargo Distribution Center CDC pada PT Pelindo IV Cabang Bitung dan sudah berjalan pengoperasiannya serta akan dilaksanakan evaluasi secara periodik. Saat ini sedang dikaji program sinergi antara TPK Bitung dan Cabang Bitung untuk mengoptimalisasikan pasar yang ada; e. Untuk pengoperasian CCC dan CDC pada Cabang Balikpapan telah dilaksanakan penandatanganan MoU antara Cabang Balikpapan dengan PT Altus Logistik Service Indonesia No. 2HK.302IDUT- 2013, tanggal 27 Februari 2013, sebagai awal untuk menjadikan Pelabuhan Balikpapan sebagai logistiksupply base kegiatan penambangan; f. Pelaksanaan evaluasi dan pembahasan kembali dalam rangka melanjutkan dan perintisan angkutan langsung petikemas luar negeri international direct call di TPK Makassar; g. New Services One Stop Service untuk layanan port of tanjung Batu; b. penetration and market development of containers and special cargo liquid bulk and dry bulk, delegation of authority pilotage in mandatory pilotage zone in Lubuk tutung sengatta, based on the letter of the Director of pt pelabuhan indonesia iV persero to the Director general of sea transportation, Ministry of transportation no. 14KB.0011Dut-2014 dated 17 september 2014; c. Development of new productservice logistic support, iCD, property at port of Bitung ihp has been completed with the results of the study by Consulting Firm pt Matra prime satria; Development of Manado port is still on study; Mou of the development of the port of Balikpapan had been signed with pt sugico graha no. 20 hK3022DKp-2013 dated 30 October 2013; as for the development of the port of samarinda, the Directors have correspondence to the Mayor of samarinda with letter no. 06pR.1021 DOt-2014 dated 19 February 2014 concerning Agreement and Recommendation of port Master plan and sMBC Development; d. Regarding the CCC and CDC operation in Bitung Branch, Regulation by Directors no. pD 22 year 2012 on the pD systems and procedures of Cargo Consolidation Center CCC or the Cargo Distribution Center CDC at pt pelindo iV Branch Bitung has been launched and running; periodic evaluation will be implemented as well. the synergy program between tpK Bitung and Bitung Branch is currently being reviewed to optimize existing markets e. Mou between Balikpapan Branch with pt Altus Logistics service indonesia number 2 hK.302 i Dut-2013 has been signed, dated 27 February 2013 as the start to make the Balikpapan port as a logisticssupply base for mining activities f. the evaluation and re-discussion in order to continue and pioneer direct transport of container abroad international direct calls in tpK Makassar; g. new services One stop service for banking