Study Area Optimization of the Acid Catalyst Concentration for Synthesis of Anti‐Cancer Agent Gamavuton‐0 by Using Mathematical and Statistical Software
3. Methodology
As mentioned earlier that the objective of the study is to find suitable approaches to decrease flood velocity and anticipating the transport debris in the area, as well as give assurance of safe water passage. There are main goals of the analysis with different approach for each purpose. Figure describes the methodology used in the analysis. Figure . Methodology of the study For the first purpose, the analysis is done by iteration in reducing river bed slope to get stable regime; this will decrease the flood water velocity and lower the peak discharge. Where this can also reduce the momentum to transport boulder brought down the stream during flooding. The second purpose has strong relation to the first one since the reduced momentum will protect the residential urban area from excess debris and boulder. The possible approach would be constructing a debris dam or known as sabo dam. The third purpose will give assurance of safe water passage by normalize those rivers at selected sections and protect any critical banks. To do so, an estimation of years return period of design flood has been set.4. Results and Discussion
4.1. Reducing bed slope for stable regime The two rivers, Mulki and Uteki, have similar regime and stream characteristics, but the slope in the Mulki catchment has steeper slope than the Uteki catchment. Figure shows the cross‐section of each river, where both rivers has slope average more than . The slope is stabilized using check dams along the cross‐sections iteration has been done to obtained proper distance and space. Check dams are constructed across the gully bed to stop channel and lateral erosion. By reducing the original gradient of the gully channel, check dams diminish the velocity of water flow and the erosive power of run‐off FAO, . Run‐off during peak flow is conveyed safely by check dams. Temporary check dams, which have a life‐span of three to eight years, collect and hold soil and moisture in the bottom of the gully. 31 To obtain satisfactory results from structural measures, a series of check dams should be constructed for each portion of the gully bed. Because they are less likely to fall, low check dams are more desirable than high ones. Check dams may also be combined with retaining walls parallel to the gully axis in order to prevent the scouring and undermining of the gully banks. Figure . a Uteki cross‐section, b Mulki cross‐section Stabilized watershed slopes are the best assurance for the continued functioning of gully control structures. Therefore, attention must always be given to keeping the gully catchment well vegetated. f this fails, the structural gully control measures will fail as well. Figure shows the typical check dams constructed along the channel. Figure . Check dam dimensions in longitudinal section: height , horizontal distance between two dams D , slope gradient of gully bottom S b , slope gradient of line connecting spillway and foot of upstream check dam S n . Between the dams on the left, S n has a negative value reverse slope Source: Nyssen, J; 4.2. Protection against debris flow and boulders To protect the area against debris flow and boulders, after the regime has been stabled, a Sabo dam will be constructed to capture and hold the debris and boulders. Based on the natural function of Sabo dam, the height of the main dam will bring a result for the stabilization of the river’s slope in this specific area where the dam is planned to be built. There will be possibilities where the height obtain from the design will be higher than the existing cliff. Therefore, if it does happen, the height of the main dam will reflect with the height of cliff. Follows are some calculation example to obtain proper dimension of proposed dam. 32 Geometric properties of the river: • Baseflow elevation on the downstream of the Sabo Dam River : . m • Elevation of the cliff : . m The slope is determined with this equation below: , . Where: s = slope of the river d = the river bed debris’ diameter m g = acceleration due to gravity ms b = the width of the river m n = Manning coefficient Q d = Discharge of the river m s Then using equation : s = , . , , . = 0.00089 = 0.089 Considering the height of the cliff’s right side is + . m, the height of the dam is determined with this equation below: The height difference of the cliff and the river bed = . ‐ . = . m The dam height must be below from the cliff’s height where the dam height is determined to be . m. Figure 8. Sketch of the height of Uteki main dam Main dam’s width design: This equation below is used to determine the width of the main dam , Where: B = the width of the river bed m = m B = the width of the spillway m From the equation , the width of the spillway is determined to be m Figure . Sketch of the width of Uteki main dam Spillway height design: Flow rate which passes through the spillway is quantified by this equation below: B 1 = 7 m 33 Where: Q d = Discharge of the river C d = Discharge coefficient . – . g = Acceleration due to gravity = .8 ms B = the width of the spillway m = m B = the width of the upper spillway m = B + m.h w M = spillway slope h w = water level m then using equation : 8 . . ,8 . . . After the equation being executed, there is only one variable undefined which can be determine by using trial and error test. The result shows that B is . m. Free board design: The function of the free board is to avoid water to be over‐spilled into side of the river. Free board is determined based on the flow‐rate of the river. From the calculation, and based on the design rainfall, the free board height is obtained about . m. Thickness of main dam spillway: The thickness of the spillway must reflect from the stability and the probability of impact caused by the debris. The thickness is determined to be m. Depth of dam sub‐structure: This equation below is used to determine the depth of the dam structure p = sd ¼ h w + h m Where: h w = water level above spillway h m = effective height of the main dam Therefore from the equation it could have two different value of p which is: . p = h w + h m ; where p = . m . p = h w + h m ; where p = . 8 m From the results can be obtained that p value is in range between . 8 ‐ . m, where in this design the average value of p is . m. Slope of the main dam design: The slope of the main dam is designed for avoiding an intense impact from upstream’s debris because it might cause bigger damage into the dam and ignite an abrasion problem in downstream of the dam. Other than that, the slope will give a big influence to the stability of the main dam. Downstream slope of the dam is based on the material and the critical velocity that passing through the spillway and free falling on the apron floor. The downstream slope is determined with ratio of : . .Parts
» Broadband Environmental Surveillance Network
» Performance Testing and Evaluation
» for Error, and b for ChangeofError
» The membership functions, a at input Error, b at Change of Error, c at output
» Proposed Wireless ECG System
» Off‐Body Communication Experimental Test
» Annual Difference Results and discussion
» Time‐latitude diagram of Aquarius SSS in the outland‐sea
» Design Study Population and Sample
» Insect‐based protein in aquaculture
» Material and Method Process of Making Mango Seed Flour
» Percentage of Mango Seed Flour in Feed Ratio of Tegal Duck
» Mechanism of NFE Content in Mango Seed Flour for Increasing Tegal
» Introduction Materials and Methods
» Introduction Material and Methods
» Experiment Results and Discussions
» Previous Works versus The Proposed Alternative
» The 6A05G’s Relevant Properties
» Results of The 6A05G Measurement and Discussion
» Result of The Module Development and Discussion
» Chemicals and Reagents. Red dragon fruit Hylocereus polyrhizus was
» Sample Preparation and Extraction. The red dragon fruit peel RDFP
» Total Flavonoids Content. Total flavonoid content determined by means of
» Total Phenolic Content. Total phenolic content was tested using the Folin‐
» The Test of Antioxidant Potential with DPPH Method. The fraction of RDFP‐
» The determination of the Maximum Absorption Wavelength and the SPF
» Sample Preparation and Extraction. The red dragon fruit peel Hylocereus
» Total Flavonoids Content. Measurements of the total flavonoid RDFP‐AcOEt
» Total Phenolic Content. Total phenolic content of the RDFP‐AcOEt fraction
» The Test of Antioxidant Potential with DPPH Method. Antioxidant potential
» Measurement of Maximum Wavelength and SPF Sun Protection Factor
» Plant and Chemical Materials
» Administration Procedure Research Method
» The Measurement of Bone Calcium Level Using the Atomic Absorption
» Data Analisis Research Method
» Research Object Material and Methods
» Redesign of AngKot Passenger Cabin
» Adventitious root of T. Paniculatum Gaertn. : a‐d fresh biomass in batch,
» and young softwood c, f, and 1 of teak after coloring.
» Reconfigurable MIMO Antenna Design
» Evaluation of the MIMO Antenna Testing
» Introduction Configuration of Array Antenna
» Laboratory observation of fluorescence spectra
» Four component polarimetric SAR image decomposition Experiment
» Experimental results and discussion
» Satellite Data and Classification Method
» Implementation and Classification Results
» Recommendation and Future Work
» Methodology Result and Discussion
» Infrastructure and Regional Development
» Lateral Accretion and Floodplain Deposit
» Outset and Pairwise Voting Map
» If a profile p satisfies αp=αp
» Calendar system and anthropology
» Bau Nyale festival and Putri Mandalika
» Globalization and local calendar system
» Daily Works at Himawari Nursing Home
» Response of Public to Bank Muamalat Indonesia
» Based on respondent knowledge Table Response of Public Based On Knowledge Opinion
» Based on Types of Respondent
» Public Response to the aspect of Service
» Public Response to the aspect of Socialization
» Public Response to the aspect of Benefit
» Market Mechanism Of Ibn Taimiyah In Perspective Of Adiwarman Karim
» Market Mechanism Of Ibn Taimiyah In Perspective Of Veithzal Rivai
» Introduction Specification and Variety of Digital Materials
» Barrier for Dissemination of Digital Textbooks
» Indonesian Fisherman Poverty in Indonesia’s Border Area
» Achievement of Sustainable Development Goals SDGs and National
» Fishermen’s Custom Home Assistance Program
» Unfamiliar concepts for foreigner non‐Japanese manga readers
» Characteristics of organic farming communities and their backgrounds
» Findings of The Field Study.
» Assessment on The Hypothesis.
» Communication in the nursing
» The Simplest Model for Japan’s Phillips Curve
» Theoretical Underpinnings for Contradictory Results
» Ryosai Kenbo and Kyoiku‐Mama as the Wanted Ideal Motherhood
» The importance of spatial association
» Framework: method and material
» Japanese shopping street unions
» Case study of the Sengen shopping street in Chiba City
» The Role of A Paddy Rice Production in the Enrekang Regency
» The Role of A Paddy Rice Production in the Toraja Regencies
» Definition of Learning Style
» Aspects of Learning Vocabulary
» Vocabulary Mastery Review Of Related Literature
» Interpretation The Result of Data Analysis
» 78 The Result of Data Analysis
» Discussion The Result of Data Analysis
» Baker’s Interpretation From Wittgenstein’s Philosophy of Mathematics
» A Hidden Aspect that the PLA reveals
» Aerosols and RH characteristics in Chiba
» Conclusion Introduction Data and Methods
» Observation at Lombok Geomagnetic Observatory
» Spectrum of Variation Recording
» Microsatellite CP‐SAR Ground Station
» FPGA‐based Baseband Waveform Synthesizer
» Sample Window Time and PRF Graphical User Interface
» Disaster mitigation and sustainable engineering
» Experimental and future works
» Products from industries and projects
» Methodology Results and Discussion
» Ternate island and its volcano
» Hazard and vulnerability of Ternate Island
» Ecosystem based disaster risk management
» Chirp signal generation of PDDS method
Show more