BTPJ; STRUKTUR BIAYA TRANSAKSI

HTS = 1.10HTS; HJG = 1.10HJG; BPER = 1.10 BPER; BTPJ =

1.10 BTPJ;

HRUM = 1.10HRUM; HPUJ = 1.10HPUJ; UTK = 1.10UTK; BPER = 0.90BPER; RUN ; PROC SIMNLIN DATA=D1 SIMULATE STAT OUTPREDICT THEIL; ENDOGENOUS PROS PROSJ PRODJ LHNJ JRUM JBJ JPUJ JPTJ TKDS TKDJj TKLJj TKSJj CTDUOj KP KNP IPD KONJ BSPS BSPJ BTKJ BTRS BTRJ BTR RUTS PUTS PUJ TPRT PSD ISM KT TP SPJ HTSBS HJGB UTKB UTKBJ USSB TBPS TBJ TBPJ PROJ; INSTRUMENTS LBS HRUM HBJ HPUJ HPTJ HPKJ RHPTJ JPKJ TP1 TKDULj ANG PFO HTS HJG TAB BRUM RUTSJ OBT BKONJ BBJ BPJ BPUJ BPTJ BPKJ BTKDJ BTKLJ BTRA BADM BRET BTPB BTPP RSTS RSLS TBS TBJ PUTL PBTN PLUT PUL TAX IKE JAKK RUJ UTK BPER BTPJ; PARAMETERS A1 0.007166 A2 0.004160 A3 0.007287 A4 2.399869 B0 - 24.0278 B1 0.000088 B2 0.714660 C0 31020.3 C1 20.85564 C2 47.20514 C3 190.7355 C4 4.125E-6 C5 0.000128 D0 - 0.30416 D1 0.000369 D2 0.001355 D3 0.000992 D4 0.003664 D5 0.002644 D6 8.015E-9 E0 6331.250 E1 - 20.8645 E2 7.340725 E3 14.95259 F0 36.13875 F1 - 0.00151 F2 39.01067 F3 - 0.50892 G0 - 4294.42 G1 - 4.60842 G2 5.686840 G3 148.3633 G4 3.064E-7 G5 - 2.49527 H0 - 1545.60 H1 - 520.829 H2 2.133511 H3 0.021069 H4 143.9526 H5 - 1.25E-6 I0 415.5707 I1 0.000312 I2 - 0.01709 I3 0.000019 J0 - 1064.58 J1 0.382498 J2 - 0.01741 J3 - 2.69319 J4 0.000066 J5 0.000114 K0 217.0378 K1 - 0.03531 K2 - 0.12566 K3 - 6.55E-7 K4 1.615E-6 K5 0.000171 L0 - 946.325 L1 0.166732 L2 - 0.03858 L3 0.065807 L4 32.18042 M0 - 1859.03 M1 0.811399 M2 - 0.47435 M3 - 0.50812 M4 374.7444 M5 - 102.510 M6 - 0.00003 P0 3123100 P1 1083476 P2 121564.3 P3 0.003898 Q0 2596139 Q1 123988.1 Q2 471818.6 Q3 0.002304 R0 - 118982 R1 150394.6 R2 - 0.05553 R3 0.002335 S0 496.0788 S1 0.000011 S2 4.699E-6 S3 0.00641 ; PROS = A1HTSBS+A2JRUM+A3KONJ+A4LBS; PROSJ = B0+B1HTSBS+B2PROS; PRODJ = C0+C1HJGB+C2TKLJj+C3TKSJj+C4HTSPROS+ C5PLUT; LHNJ = D0+D1TKDJj+D2TKLJj+D3JPUJ+D4JBJ+D5JPTJ+ D6HTSPROS; JRUM = E0+E1HRUM+E2PROS+E3HJG; JBJ = F0+F1HBJ+F2LHNJ+F3BTRJ; JPUJ = G0+G1HPUJ+G2HPTJ+G3LHNJ+G4RUTS+G5BTRJ; JPTJ = H0+H1HPTJHJG+H2HPUJ+H3HPKJ+H4LHNJ+ H5TP; TKDS = I0+I1UTKB+I2CTDUOj+I3BSPS; TKDJj = J0+J1UTKBJ+J2TKDS+J3TKLJj+J4PROJ+J5BSPJ; TKLJj = K0+K1UTKBJ+K2TKDJj+K3KP+ISM+ K4HTSPROS+K5SPJ; TKSJj = L0+L1USSB+L2TKLJj+L3TKDJj+L4LHNJ; CTDUOj = M0+M1UTKBJ+M2TKDS+M3TKDULj+M4ANG+M5PFO+ M6HTSPROS; BPER = N1PROSJ+N2HTS; BTPJ = O0+O1HJG+O2KONJ; KP = P0+P1ANG+P2PFO+P3TPRT; KNP = Q0+Q1PFO+Q2JAKK+Q3TPRT; IPD = R0+R1PFO+R2TAB+R3TPRT; KONJ = S0+S1HRUMJRUM+S2HTSPROS+S3PROJ; BSPS = HRUMJRUM+OBT+BPJ+HJGKONJ; BSPJ = HBJJBJ+HPUJJPUJ+HPTJJPTJ+HPKJJPKJ; BTKJ = UTKTKDJj+UTKTKLJj; BTRS = BTRA+BPER+BADM+BRET; BTRJ = BTPJ+BTPB+BTPP; BTR = BTRS+BTRJ; RUTS = HTSPROS+RSTS+USSTKSJj; PUTS = RUTS-TBPS-BTRS; PUJ = HJGPROJ-TBJ; TPRT = PUTS+PUJ+PUTL+PBTN+PLUT+PUL; PSD = TPRT-TAX; ISM = IPD+IKE; KT = KP+KNP; TP = KT+ISM; SPJ = PROJ-KONJ; HTSBS = HTS-BTRS; HJGB = HJG-BTPJ; UTKB = UTK+BTRS; UTKBJ = UTK+BTRJ; USSB = UTK+BTR; TBPS = UTKTKDS+BSPS; TBJ = TBPJ+BTRJ; TBPJ = BSPJ+BTKJ; PROJ = PRODJLHNJ; RUN ; Lampiran 6. Print Out Hasil Simulasi Model Perilaku Ekonomi Rumahtangga Petani Usaha Ternak Sapi - Jagung di Minahasa Metode 2SLS PROC SYSLIN SASETS Versi 9.0 1. Peningkatan Biaya Perantara Sapi, Biaya Transpor Jagung, Harga Sapi dan Harga Jagung The SAS System 08:47 Tuesday, June 15, 2008 13 The SIMNLIN Procedure Simultaneous Simulation Descriptive Statistics Actual Predicted Variable N Obs N Mean Std Dev Mean Std Dev Label PROS 194 194 331.0 115.3 376.6 33.4452 PROS PROSJ 194 194 215.0 101.6 247.9 23.9846 PROSJ PRODJ 194 194 4059.9 10026.7 234797 109082 PRODJ LHNJ 194 194 0.8253 0.7109 1.5982 0.3991 LHNJ JRUM 194 194 16856.2 5291.7 18838.6 394.5 JRUM JBJ 194 194 41.1856 41.1610 70.8949 20.5339 JBJ JPUJ 194 194 220.4 150.2 335.2 85.4250 JPUJ JPTJ 194 194 176.3 138.6 355.8 83.5953 JPTJ TKDS 194 194 533.8 151.0 624.1 47.2781 TKDS TKDJj 194 194 360.6 188.1 148.7 172.1 TKDJj TKLJj 194 194 49.7835 44.1865 145.9 69.8100 TKLJj TKSJj 194 194 48.5928 36.9801 901.5 554.9 TKSJj CTDUOj 194 194 1060.7 1045.0 805.2 544.7 CTDUOj KP 194 194 7999416 1970965 9787272 1890319 KP KNP 194 194 4029784 2119892 5086521 1012718 KNP IPD 194 194 1103712 1840780 2174679 957606 IPD KONJ 194 194 688.8 571.0 3114.2 1933.0 KONJ BSPS 194 194 6951763 2173984 11525447 2351634 BSPJ 194 194 807700 644825 1299542 461732 BTKJ 194 194 1802171 760220 1100593 404303 BTRS 194 194 6463.2 3093.3 6974.8 3397.1 BTRJ 194 194 47.4471 13.0711 48.3198 13.2713 BTR 194 194 6510.7 3093.4 7023.1 3397.2 RUTS 194 194 15606313 4878402 23332916 3798946 PUTS 194 194 6658336 5273368 9475336 2918446 PUJ 194 194 8148338 62707266 4.6399E8 3.6571E8 TPRT 194 194 30248031 64052416 4.8891E8 3.6657E8 PSD 194 194 30225747 64050046 4.8888E8 3.6657E8 ISM 194 194 1208531 1844276 2279499 962870 KT 194 194 12029200 3612041 14873793 2798899 TP 194 194 13237732 4658275 17153291 3630678 SPJ 194 194 9077.1 57163.2 381422 299574 HTSBS 194 194 28691.4 3190.8 31695.3 3503.1 HJGB 194 194 1093.3 14.0543 1163.9 19.3971 UTKB 194 194 10189.1 3087.1 10749.0 3391.0 UTKBJ 194 194 3773.3 60.1729 3774.2 60.2567 USSB 194 194 10236.6 3087.3 10749.0 3391.0 TBPS 194 194 8941514 2386800 13850605 2516317 TBJ 194 194 2609919 1192593 2400184 689938 TBPJ 194 194 2609871 1192597 2400136 689942 PROJ 194 194 9765.9 57534.8 384536 301507 2. Peningkatan Biaya Perantara Sapi, Biaya Transpor Jagung, Harga Rumput, Harga Pupuk Urea dan Upah Tenaga Kerja The SAS System 08:47 Tuesday, June 15, 2008 17 The SIMNLIN Procedure Simultaneous Simulation Descriptive Statistics Actual Predicted Variable N Obs N Mean Std Dev Mean Std Dev Label PROS 194 194 331.0 115.3 380.8 32.8650 PROS PROSJ 194 194 215.0 101.6 250.9 23.5259 PROSJ PRODJ 194 194 4059.9 10026.7 251802 109506 PRODJ LHNJ 194 194 0.8253 0.7109 2.1194 0.4098 LHNJ JRUM 194 194 16856.2 5291.7 18031.4 403.8 JRUM JBJ 194 194 41.1856 41.1610 91.2258 20.8513 JBJ JPUJ 194 194 220.4 150.2 ‐103.5 86.8498 JPUJ JPTJ 194 194 176.3 138.6 667.8 84.4884 JPTJ TKDS 194 194 533.8 151.0 651.0 62.9156 TKDS TKDJj 194 194 360.6 188.1 335.1 230.8 TKDJj TKLJj 194 194 49.7835 44.1865 136.3 94.9441 TKLJj TKSJj 194 194 48.5928 36.9801 993.0 550.9 TKSJj CTDUOj 194 194 1060.7 1045.0 1089.9 546.8 CTDUOj KP 194 194 7999416 1970965 10543193 2253724 KP KNP 194 194 4029784 2119892 5533325 1255235 KNP IPD 194 194 1103712 1840780 2627495 1224024 IPD KONJ 194 194 688.8 571.0 4157.1 2601.5 KONJ BSPS 194 194 6951763 2173984 13189613 3170691 BSPJ 194 194 807700 644825 1367537 480912 BTKJ 194 194 1802171 760220 1935587 578053 BTRS 194 194 6463.2 3093.3 6974.8 3397.1 BTRJ 194 194 47.4471 13.0711 48.3198 13.2713 BTR 194 194 6510.7 3093.4 7023.1 3397.2 RUTS 194 194 15606313 4878402 24012322 3917590 PUTS 194 194 6658336 5273368 8148055 2978181 PUJ 194 194 8148338 62707266 6.5924E8 4.9188E8 TPRT 194 194 30248031 64052416 6.8283E8 4.9198E8 PSD 194 194 30225747 64050046 6.8281E8 4.9198E8 ISM 194 194 1208531 1844276 2732315 1227699 KT 194 194 12029200 3612041 16076517 3422060 TP 194 194 13237732 4658275 18808832 4543018 SPJ 194 194 9077.1 57163.2 542182 402986 HTSBS 194 194 28691.4 3190.8 31695.3 3503.1 HJGB 194 194 1093.3 14.0543 1163.9 19.3971 UTKB 194 194 10189.1 3087.1 11121.6 3390.4 UTKBJ 194 194 3773.3 60.1729 4146.8 65.8134 USSB 194 194 10236.6 3087.3 11121.6 3390.4 TBPS 194 194 8941514 2386800 15857293 3414381 TBJ 194 194 2609919 1192593 3303173 811187 TBPJ 194 194 2609871 1192597 3303124 811191 PROJ 194 194 9765.9 57534.8 546339 405587 3. Peningkatan Biaya Perantara Sapi, Biaya Transpor Jagung, Harga Sapi, Harga Jagung, Harga Rumput, Harga Pupuk Urea dan Upah Tenaga Kerja The SAS System 08:47 Tuesday, June 15, 2008 21 The SIMNLIN Procedure Simultaneous Simulation Descriptive Statistics Actual Predicted Variable N Obs N Mean Std Dev Mean Std Dev Label PROS 194 194 331.0 115.3 337.6 33.8090 PROS PROSJ 194 194 215.0 101.6 219.7 24.2570 PROSJ PRODJ 194 194 4059.9 10026.7 243656 108937 PRODJ LHNJ 194 194 0.8253 0.7109 1.3568 0.4013 LHNJ JRUM 194 194 16856.2 5291.7 16066.2 396.3 JRUM JBJ 194 194 41.1856 41.1610 61.4784 20.6309 JBJ JPUJ 194 194 220.4 150.2 ‐217.6 85.8946 JPUJ JPTJ 194 194 176.3 138.6 488.0 84.4203 JPTJ TKDS 194 194 533.8 151.0 595.6 38.8291 TKDS TKDJj 194 194 360.6 188.1 386.0 153.8 TKDJj TKLJj 194 194 49.7835 44.1865 91.2668 61.7899 TKLJj TKSJj 194 194 48.5928 36.9801 973.5 556.3 TKSJj CTDUOj 194 194 1060.7 1045.0 1201.9 544.3 CTDUOj KP 194 194 7999416 1970965 9420543 1717202 KP KNP 194 194 4029784 2119892 4869758 891024 KNP IPD 194 194 1103712 1840780 1955000 817685 IPD KONJ 194 194 688.8 571.0 2805.1 1719.6 KONJ BSPS 194 194 6951763 2173984 10372928 1905221 BSPJ 194 194 807700 644825 861802 468512 BTKJ 194 194 1802171 760220 1959359 415751 BTRS 194 194 6463.2 3093.3 6974.8 3397.1 BTRJ 194 194 47.4471 13.0711 48.3198 13.2713 BTR 194 194 6510.7 3093.4 7023.1 3397.2 RUTS 194 194 15606313 4878402 21043777 3730221 PUTS 194 194 6658336 5273368 8223195 2939464 PUJ 194 194 8148338 62707266 3.7116E8 2.9597E8 TPRT 194 194 30248031 64052416 3.9483E8 2.9722E8 PSD 194 194 30225747 64050046 3.948E8 2.9722E8 ISM 194 194 1208531 1844276 2059819 824139 KT 194 194 12029200 3612041 14290301 2493301 TP 194 194 13237732 4658275 16350120 3170055 SPJ 194 194 9077.1 57163.2 336318 266537 HTSBS 194 194 28691.4 3190.8 28179.9 3482.8 HJGB 194 194 1093.3 14.0543 1053.7 18.4485 UTKB 194 194 10189.1 3087.1 11121.6 3390.4 UTKBJ 194 194 3773.3 60.1729 4146.8 65.8134 USSB 194 194 10236.6 3087.3 11121.6 3390.4 TBPS 194 194 8941514 2386800 12813607 2052563 TBJ 194 194 2609919 1192593 2821209 711630 TBPJ 194 194 2609871 1192597 2821161 711635 PROJ 194 194 9765.9 57534.8 339123 268257 4. Penurunan Biaya Perantara Sapi, Peningkatan Biaya Transpor Sapi, Administrasi, Retribusi, Transpor Jagung, Harga Sapi dan Harga Jagung, Harga Rumput, Harga Pupuk Urea dan Upah Tenaga Verja The SAS System 08:47 Tuesday, June 15, 2008 45 The SIMNLIN Procedure Simultaneous Simulation Descriptive Statistics Actual Predicted Variable N Obs N Mean Std Dev Mean Std Dev Label PROS 194 194 331.0 115.3 380.7 33.0473 PROS PROSJ 194 194 215.0 101.6 250.9 23.6819 PROSJ PRODJ 194 194 4059.9 10026.7 216384 89754.9 PRODJ LHNJ 194 194 0.8253 0.7109 1.5903 0.3929 LHNJ JRUM 194 194 16856.2 5291.7 18869.1 392.4 JRUM JBJ 194 194 41.1856 41.1610 70.5862 20.3299 JBJ JPUJ 194 194 220.4 150.2 333.8 84.6556 JPUJ JPTJ 194 194 176.3 138.6 355.3 83.1217 JPTJ TKDS 194 194 533.8 151.0 616.8 36.7562 TKDS TKDJj 194 194 360.6 188.1 175.9 135.3 TKDJj TKLJj 194 194 49.7835 44.1865 134.5 52.8413 TKLJj TKSJj 194 194 48.5928 36.9801 755.3 457.7 TKSJj CTDUOj 194 194 1060.7 1045.0 803.9 544.6 CTDUOj KP 194 194 7999416 1970965 9549565 1675585 KP KNP 194 194 4029784 2119892 4946019 862712 KNP IPD 194 194 1103712 1840780 2032287 785381 IPD KONJ 194 194 688.8 571.0 2794.3 1471.8 KONJ BSPS 194 194 6951763 2173984 11149680 1800035 BSPJ 194 194 807700 644825 1296561 459925 BTKJ 194 194 1802171 760220 1159275 339574 BTRS 194 194 6463.2 3093.3 6086.4 2797.1 BTRJ 194 194 47.4471 13.0711 48.3198 13.2713 BTR 194 194 6510.7 3093.4 6134.7 2797.3 RUTS 194 194 15606313 4878402 22671288 3472928 PUTS 194 194 6658336 5273368 9217822 2895191 PUJ 194 194 8148338 62707266 4.0327E8 2.7848E8 TPRT 194 194 30248031 64052416 4.2792E8 2.795E8 PSD 194 194 30225747 64050046 4.279E8 2.795E8 ISM 194 194 1208531 1844276 2137107 791930 KT 194 194 12029200 3612041 14495585 2420380 TP 194 194 13237732 4658275 16632692 3060347 SPJ 194 194 9077.1 57163.2 331731 228094 HTSBS 194 194 28691.4 3190.8 32583.7 2935.4 HJGB 194 194 1093.3 14.0543 1163.9 19.3971 UTKB 194 194 10189.1 3087.1 9860.6 2791.4 UTKBJ 194 194 3773.3 60.1729 3774.2 60.2567 USSB 194 194 10236.6 3087.3 9860.6 2791.4 TBPS 194 194 8941514 2386800 13447379 1926440 TBJ 194 194 2609919 1192593 2455884 669034 TBPJ 194 194 2609871 1192597 2455836 669039 PROJ 194 194 9765.9 57534.8 334525 229565 5. Penurunan Biaya Perantara Sapi, Peningkatan Biaya Transpor Sapi, Administrasi, Retribusi, Transpor Jagung, Harga Rumput, Harga Pupuk Urea dan Upah Tenaga Verja The SAS System 08:47 Tuesday, June 15, 2008 33 The SIMNLIN Procedure Simultaneous Simulation Descriptive Statistics Actual Predicted Variable N Obs N Mean Std Dev Mean Std Dev Label PROS 194 194 331.0 115.3 384.1 32.6335 PROS PROSJ 194 194 215.0 101.6 253.3 23.3603 PROSJ PRODJ 194 194 4059.9 10026.7 223313 90052.8 PRODJ LHNJ 194 194 0.8253 0.7109 2.1063 0.4004 LHNJ JRUM 194 194 16856.2 5291.7 18055.7 402.4 JRUM JBJ 194 194 41.1856 41.1610 90.7144 20.5528 JBJ JPUJ 194 194 220.4 150.2 ‐105.7 85.7366 JPUJ JPTJ 194 194 176.3 138.6 666.8 83.8396 JPTJ TKDS 194 194 533.8 151.0 640.9 47.6508 TKDS TKDJj 194 194 360.6 188.1 372.3 175.8 TKDJj TKLJj 194 194 49.7835 44.1865 120.7 70.5582 TKLJj TKSJj 194 194 48.5928 36.9801 847.5 454.9 TKSJj CTDUOj 194 194 1060.7 1045.0 1090.8 546.1 CTDUOj KP 194 194 7999416 1970965 10222386 1894003 KP KNP 194 194 4029784 2119892 5343705 1016475 KNP IPD 194 194 1103712 1840780 2435324 961857 IPD KONJ 194 194 688.8 571.0 3723.8 1942.7 KONJ BSPS 194 194 6951763 2173984 12674742 2375360 BSPJ 194 194 807700 644825 1362156 478384 BTKJ 194 194 1802171 760220 2023623 465640 BTRS 194 194 6463.2 3093.3 6086.4 2797.1 BTRJ 194 194 47.4471 13.0711 48.3198 13.2713 BTR 194 194 6510.7 3093.4 6134.7 2797.3 RUTS 194 194 15606313 4878402 23321363 3546081 PUTS 194 194 6658336 5273368 8014003 2901206 PUJ 194 194 8148338 62707266 5.7708E8 3.6739E8 TPRT 194 194 30248031 64052416 6.0053E8 3.6788E8 PSD 194 194 30225747 64050046 6.0051E8 3.6787E8 ISM 194 194 1208531 1844276 2540143 966879 KT 194 194 12029200 3612041 15566091 2806517 TP 194 194 13237732 4658275 18106234 3642648 SPJ 194 194 9077.1 57163.2 474938 300935 HTSBS 194 194 28691.4 3190.8 32583.7 2935.4 HJGB 194 194 1093.3 14.0543 1163.9 19.3971 UTKB 194 194 10189.1 3087.1 10233.2 2790.8 UTKBJ 194 194 3773.3 60.1729 4146.8 65.8134 USSB 194 194 10236.6 3087.3 10233.2 2790.8 TBPS 194 194 8941514 2386800 15301273 2558429 TBJ 194 194 2609919 1192593 3385828 757467 TBPJ 194 194 2609871 1192597 3385779 757471 PROJ 194 194 9765.9 57534.8 478662 302878 6. Penurunan Biaya Perantara Sapi, Peningkatan Biaya Transpor Sapi, Administrasi, Retribusi, Transpor Jagung, Harga Sapi, Harga Jagung, Harga Rumput, Harga Pupuk Urea dan Upah Tenaga Kerja The SAS System 08:47 Tuesday, June 15, 2008 41 The SIMNLIN Procedure Simultaneous Simulation Descriptive Statistics Actual Predicted Variable N Obs N Mean Std Dev Mean Std Dev Label PROS 194 194 331.0 115.3 384.1 32.6335 PROS PROSJ 194 194 215.0 101.6 253.3 23.3603 PROSJ PRODJ 194 194 4059.9 10026.7 223313 90052.8 PRODJ LHNJ 194 194 0.8253 0.7109 2.1063 0.4004 LHNJ JRUM 194 194 16856.2 5291.7 18055.7 402.4 JRUM JBJ 194 194 41.1856 41.1610 90.7144 20.5528 JBJ JPUJ 194 194 220.4 150.2 ‐105.7 85.7366 JPUJ JPTJ 194 194 176.3 138.6 666.8 83.8396 JPTJ TKDS 194 194 533.8 151.0 640.9 47.6508 TKDS TKDJj 194 194 360.6 188.1 372.3 175.8 TKDJj TKLJj 194 194 49.7835 44.1865 120.7 70.5582 TKLJj TKSJj 194 194 48.5928 36.9801 847.5 454.9 TKSJj CTDUOj 194 194 1060.7 1045.0 1090.8 546.1 CTDUOj KP 194 194 7999416 1970965 10222386 1894003 KP KNP 194 194 4029784 2119892 5343705 1016475 KNP IPD 194 194 1103712 1840780 2435324 961857 IPD KONJ 194 194 688.8 571.0 3723.8 1942.7 KONJ BSPS 194 194 6951763 2173984 12674742 2375360 BSPJ 194 194 807700 644825 1362156 478384 BTKJ 194 194 1802171 760220 2023623 465640 BTRS 194 194 6463.2 3093.3 6086.4 2797.1 BTRJ 194 194 47.4471 13.0711 48.3198 13.2713 BTR 194 194 6510.7 3093.4 6134.7 2797.3 RUTS 194 194 15606313 4878402 23321363 3546081 PUTS 194 194 6658336 5273368 8014003 2901206 PUJ 194 194 8148338 62707266 5.7708E8 3.6739E8 TPRT 194 194 30248031 64052416 6.0053E8 3.6788E8 PSD 194 194 30225747 64050046 6.0051E8 3.6787E8 ISM 194 194 1208531 1844276 2540143 966879 KT 194 194 12029200 3612041 15566091 2806517 TP 194 194 13237732 4658275 18106234 3642648 SPJ 194 194 9077.1 57163.2 474938 300935 HTSBS 194 194 28691.4 3190.8 32583.7 2935.4 HJGB 194 194 1093.3 14.0543 1163.9 19.3971 UTKB 194 194 10189.1 3087.1 10233.2 2790.8 UTKBJ 194 194 3773.3 60.1729 4146.8 65.8134 USSB 194 194 10236.6 3087.3 10233.2 2790.8 TBPS 194 194 8941514 2386800 15301273 2558429 TBJ 194 194 2609919 1192593 3385828 757467 TBPJ 194 194 2609871 1192597 3385779 757471 PROJ 194 194 9765.9 57534.8 478662 302878

VII. HASIL PENDUGAAN MODEL EKONOMI RUMAHTANGGA PETANI USAHA TERNAK SAPI-TANAMAN