PENGEMBANGAN LISTRIK PERDESAAN RENCANA PENYEDIAAN TENAGA LISTRIK 2010 – 2019

RUPTL 2010 - 2019 97 Tabel 4.42 Proyek Pembangkit PLTU Skala Kecil Tersebar di Indonesia Timur NO. PEMILIK NO. PEMILIK 1 WIL. PAPUA 6 WIL. SULSELRABAR 1 PLTU Biak 2 x 7 MW IPP 1 PLTU Kolaka 2 x 10 MW IPP 2 PLTU Manokwari 2 x 7 MW IPP 2 PLTU Selayar 2 x 4 MW IPP 3 PLTU Merauke 2 x 7 MW IPP 3 PLTU Bau Bau 2 x 10 MW PLN 4 PLTU Nabire 2 x 7 MW IPP 4 PLTU Wangi wangi 2 x 3 MW PLN 5 PLTU Sorong 2 x 15 MW IPP 5 PLTU Raha 2 x 3 MW PLN 6 PLTU Timika 2 x 7 MW PLN 6 PLTU Kendari ‐ 3 Extension 1 x 10 MW PLN 2 WIL. MALUKU MALUKU UTARA 7 WIL. KALTIM 1 PLTU Masohi 2 x 4 MW IPP 1 PLTU Melak 2 x 7 MW IPP 2 PLTU Tobelo 2 x 4 MW IPP 2 PLTU Nunukan 2 x 7 MW IPP 3 PLTU Tual 2 x 4 MW IPP 3 PLTU Tanjung Selor 2 x 7 MW PLN 4 PLTU Langgur 2 x 3 MW PLN 4 PLTU Malinau 2 x 3 MW PLN 5 PLTU Namlea Buru 2 x 3 MW PLN 5 PLTU Berau 2 x 7 MW PLN 6 PLTU Piru Seram Barat 2 x 3 MW PLN 7 PLTU Sofifi 2 x 3 MW PLN 8 WIL. KALSELKALTENG 1 PLTU Kuala Kurun 2 x 3 MW IPP 3 WIL. NUSA TENGGARA TIMUR 2 PLTU Buntok 2 x 7 MW PLN 1 PLTU Larantuka 2 x 4 MW IPP 3 PLTU Kuala Pambuang 2 x 3 MW PLN 2 PLTU Waingapu 2 x 4 MW IPP 4 PLTU Kotabaru 2 x 7 MW PLN 3 PLTU Kalabahi Alor 2 x 3 MW PLN 4 PLTU Rote 2 x 3 MW PLN Total Lokasi 5 PLTU Labuhan Bajo 2 x 3 MW PLN Kapasitas MW Jumlah Unit Unit 4 WIL. NUSA TENGGARA BARAT 1 PLTU Sumbawa 2 x 10 MW IPP PLN : 26 Lokasi, IPP : 20 lokasi 2 PLTU Sumbawa Barat 2 x 7 MW PLN PLN : 225 MW, IPP : 274 MW 5 WIL. SULUTTENGGO 1 PLTU Tahuna 2 x 4 MW IPP 2 PLTU Luwuk 2 x 10 MW IPP 3 PLTU Moutong 2 x 4 MW IPP 4 PLTU Palu 1 x 30 MW IPP 5 PLTU Leok 2 x 3 MW PLN 6 PLTU Kolonodale 2 x 3 MW PLN 7 PLTU Ampana 3 x 3 MW PLN 8 PLTU Talaud 2 x 3 MW PLN 9 PLTU Toli‐toli 2 x 3 MW PLN 10 PLTU Bangkir 2 x 3 MW PLN 11 PLTU Tambu 2 x 3 MW PLN 46 499 91 WILAYAH INDONESIA TIMUR UNIT WILAYAH INDONESIA TIMUR UNIT Catatan : PLTU Manokwari = PLTU Andai Pada saat RUPTL ini disusun, PLN tengah melakukan survei lokasi dan studi kelayakan, sehingga rincian proyek pada Tabel 4.41 dan 4.42 masih dapat berubah sesuai hasil survei dan studi. 98 RUPTL 2010 - 2019

BAB V KEBUTUHAN DANA INVESTASI

5.1 PROYEKSI KEBUTUHAN INVESTASI INDONESIA Untuk membangun sarana pembangkitan, transmisi dan distribusi tenaga listrik sebagaimana diuraikan pada Bab 4 diperlukan dana investasi sebesar US 61,5 milyar sebagaimana diperlihatkan pada Tabel 5.1 dan Gambar 5.1. Dana sebesar itu hanya mencakup proyek-proyek PLN saja dan belum mencakup dana investasi untuk proyek listrik swastaIPP. Tabel 5.1 Kebutuhan Dana Investasi PLN Indonesia Tidak Termasuk IPP Juta US 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Total Fc 2,150.5 2,142.6 2,467.0 2,086.6 1,694.6 1,692.6 2,485.8 2,988.9 3,074.7 3,226.1 24,009.2 Lc 1,015.8 1,087.9 1,018.0 852.0 769.2 952.7 1,317.2 1,276.8 1,234.7 1,484.0 11,008.4 Total 3,166.3 3,230.5 3,485.0 2,938.6 2,463.8 2,645.3 3,803.0 4,265.7 4,309.4 4,710.2 35,017.7 Fc 1,384.5 1,498.9 1,136.0 1,112.6 1,351.1 1,758.4 1,045.0 778.7 632.3 611.3 11,308.6 Lc 603.3 547.0 441.0 397.1 485.0 480.5 265.2 192.3 245.7 229.4 3,886.6 Total 1,987.7 2,045.9 1,577.0 1,509.7 1,836.1 2,239.0 1,310.1 971.0 878.0 840.7 15,195.2 Fc - - - - - - - - - - - Lc 781.2 1,087.4 1,014.0 956.0 999.9 1,183.6 1,210.5 1,330.1 1,371.7 1,340.3 11,274.7 Total 781.2 1,087.4 1,014.0 956.0 999.9 1,183.6 1,210.5 1,330.1 1,371.7 1,340.3 11,274.7 Fc 3,534.9 3,641.5 3,603.0 3,199.1 3,045.7 3,451.0 3,530.7 3,767.5 3,706.9 3,837.4 35,317.8 Lc 2,400.3 2,722.3 2,473.0 2,205.2 2,254.1 2,616.9 2,792.9 2,799.2 2,852.1 3,053.8 26,169.7 Total 5,935.2 6,363.7 6,076.0 5,404.3 5,299.8 6,067.9 6,323.6 6,566.7 6,559.1 6,891.2 61,487.6 Item Pembangkit Penyaluran Distribusi Total Melihat kebutuhan dana yang sangat besar tersebut, maka disadari adanya tantangan yang sangat besar dalam menyediakan dana tersebut. Selama ini sumber pembiayaan proyek-proyek PLN banyak diperoleh dari penerusan pinjaman dari luar negeri two step loan, namun setelah tahun 2006 peranan pinjaman semacam ini mulai berkurang dan sebaliknya pendanaan dengan obligasi terus meningkat, baik obligasi lokal maupun global. Proyek percepatan pembangkit 10.000 MW dibiayai dari pinjaman luar dan dalam negeri yang diusahakan sendiri oleh PLN dengan garansi Pemerintah. Akhir- akhir ini PLN kembali berupaya memperoleh pinjaman dari lembaga keuangan multilateral IBRD, ADB dan bilaterial JICA, AFD untuk mendanai proyek- proyek kelistrikan yang besar seperti Upper Cisokan pumped storage dan transmisi HVDC Sumatra – Jawa dengan skema two step loan.