Risiko Kerusakan Jalan Road Damage Risk

321 IPC in Brief Company Profile Management Discussion Analysis On Company Performance Corporate Governance IPC • Laporan Tahunan 2014 Annual Report 9. Risiko Kerusakan Jalan 9. Road Damage Risk CABANG RENCANA MITIGASI REALISASI MITIGASI CABANG TPK Tanjung Priok Pembangunan JalanRoad Construction 1. Pembangunan Jalan Akses di Depan PT Rukindo Persero termasuk SID dan Supervisi progres isik konstruksi 100 Construction of Access Road in front of PT Rukindo Persero including SID and Supervision physical construction with progress 100 2. Perkuatan dan Peninggian Jalan Padamarang Termasuk SID dan Supervisi dalam tahap pelaksanaan progress 100 Reinforcement and raising elevation of Padamarang Road including SID and Supervision were under implementation progress 100 3. Pembangunan Jalan Tembus dari Jalan Nusantara ke Jalan Industri 1 proses lelang Construction of access road from Jalan Nusantara to Jalan Industri 1 auction process 4. Pembangunan Jalan Tembus dari Jalan Pasoso ke Jalan Pulau Payung proses desain Construction of access road from Jalan Pasoso to Jalan Pulau Payung design process 5. Perkuatan dan Peninggian Jalan Nusantara 2 Termasuk SID dan Supervisi konstruksi 100 Reinforcement and raising elevation of Jalan Nusantara 2 including SID and supervision construction 100 4. Pelebaran Jalan Palmas termasuk SID dan supervisi selesai, 100 Widening of Jalan Palmas including SID and supervision completed 100 5. Perkuatan dan Peninggian Jalan Nusantara 1 termasuk SID dan supervisi dalam tahap pelaksanaan dengan progress 100 Reinforcement and raising elevation of Jalan Nusantara 1 including SID and supervision were under implementation with progress 100 TPK Tanjung Priok PJG Panjang Perbaikan fasilitas jalan di dalam area Pelabuhan PanjangImprovement of road facilities inside Panjang Port area 1. Pelebaran dan Perpanjangan Jalan Jawa berikut Saluran di Pelabuhan Panjang, termasuk SID dan Supervisi proses pelelangan pengadaan sedangkan SID sudah selesai 100 Road Widening and extending of Jalan Jawa along with channel in Panjang Port including SID and supervision auctionprocurement process while SID was completed 100 2. Pembuatan Jalan Beton Ex. Rabana di Pelabuhan Panjang, termasuk SID dan Supervisi, pekerjaan selesai 100 Construction of concrete road ex Rabana in Panjang Port, including SID and supervision work completed 100 PJG Panjang JBI Jambi Perbaikanpeningkatan mutu jalan di area pelabuhanRoad quality improvement inside port area Pekerjaan Perbaikan Berat dan Peninggian jalan di Pelabuhan Talang Duku termasuk SID dan Supervisi. Pekerjaan Selesai 100 di Bulan April 2014 saat ini dalam masa Pemeliharaan Heavy road improvement and raising elevation in Talang Duku Port, including SID and supervision. Construction work completed 100 in April 2014, currently on maintenance stage JBI Jambi BTN Banten Peningkatan dan perkuatan jalan area Pelabuhan Road improvement and reinforcement inside port area Peningkatan dan perkuatan jalan menuju Dermaga 004 dengan Konstruksi beton berikut penerangan termasuk SID dan supervisi Progres Fisik 100 Road improvement and reinforcement on the way to Port 004 with concrete construction with lightings, including SID and supervision physical progress 100 BTN Banten CBN Cirebon Perbaikan Berat Jl. Ambon dan Perbaikan Berat Jl. Tanjung Tengah dan Jl. IrianHeavy roadwork of Jl Ambon, Jl. Tanjung Tengah and Jl. Irian Perbaikan Berat Jl. Ambon : 100 Perbaikan Berat Jl. Tanjung Tengah dan Jl. Irian :64,14 Heavy roadwork of Jl. Ambon completed 100; heavy roadwork of Jl. Tanjung Tengah and Jl. Irian progressed 64.14 CBN Cirebon PBM P. Balam Kegiatan Monitoring Berat muatanMonitoring activities on weightload Rutin dilakukan routinely performed PBM P. Balam TPN Tg. Pandan Memasang rambu peringatan untuk Mengendalikan muatanTo install warning sign to control weightload Rambu peringatan telah dilakukan pemasangan warning signs was installed TPN Tg. Pandan 322 Sekilas IPC Profil Perusahaan Analisa Pembahasan Manajemen Atas Kinerja Perusahaan Tata Kelola Perusahaan IPC • Laporan Tahunan 2014 Annual Report 10. Risiko Kerusakan KapalMotor Pandu 10. Pilot MotorBoat Damage Risk