Pengadaan Reach StackerProcurement of Reach Pengadaan Forklift 10TProcurement of Forklift Risiko Kerusakan Dermaga Wharf Damage Risk

316 Sekilas IPC Profil Perusahaan Analisa Pembahasan Manajemen Atas Kinerja Perusahaan Tata Kelola Perusahaan IPC • Laporan Tahunan 2014 Annual Report 2. Risiko Kurang Memadainya Alat Lift OnOf 2. Reliability of Equipment Risk CABANG RENCANA MITIGASI | MITIGATION PLAN REALISASI MITIGASI | MITIGATION REALIZATION BRANCHES PLG Palembang 1. Pengadaan Reach Stackerprocurement of Reach Stacker

2. Pengadaan Side Loaderprocurement of Side

Loader

3. Pengadaan Forklift 10T dan 3Tprocurement of

Forklift 10T and 3T

4. Pengadaan RMGCprocurement of RMGC

1. Reach Stacker masih dalam tahap pelaksanaan pekerjaan dengan progress 60 Reach Stacker was still on working stage with 60 progress 2. Side Loader masih dalam tahap pelaksanaan pekerjaan dengan progress 60 Side Loader was still on working stage with 60 progress 3. Forklift masih dalam proses penandatanganan Forklift was still on agreement-signing stage 4. RMGC dalam tahap konsultan selesai 100RMGC has completed consultant’s stage at 100 PLG Palembang PTK Pontianak 1. Retroit Reach StackerRetroit Reach Stacker

2. Pengadaan RMGCprocurement of RMGC

1. Pekerjaan RS selesai 100 Reach Stacker was completed 100 2. Pekerjaan RMGC selesai 100 RMGC was completed 100 PTK Pontianak BKL Bengkulu

1. Pengadaan Reach StackerProcurement of Reach

Stacker

2. Pengadaan Forklift 10TProcurement of Forklift

10T 1. Pekerjaan RS selesai 100 Reach Stacker was completed 100 2. Pekerjaan FLift : proses kontrak FLift work: contract process BKL Bengkulu PBM P. Batam Pengadaan Reach StackerProcurement of Reach Stacker Pekerjaan selesai 100 Work was completed 100 PBM Pangkal Balam 3. Risiko Kerusakan Dermaga 3. Wharf Damage Risk CABANG RENCANA MITIGASI | MITIGATION PLAN REALISASI MITIGASI | MITIGATION REALIZATION BRANCHES TPK Tanjung Priok Peninggian, perkuatan, dan pendalaman Dermaga investasi serta AsuransiRaising elevation, reinforcement and deepening of port investment and insurance 1. Peninggian dan Perkuatan Dermaga 001-004 selesai Raising and reinforcement of Port 001- 004 was completed 2. Perkuatan dan Pemasangan Rel Gantry Luing Crane berikut pendalaman di dermaga 103-105 selesai Reinforcement and Installment of Gantry Luing Crane Rail and deepening in Port 103-105 was completed 3. Pendalaman dan Perkuatan Dermaga 111-113 selesai cheklist perbaikan Deepening and Reinforcement of Port 111-113 was completed checklist and renovation 4. Perkuatan dan pendalaman Dermaga 201-203 selesai Reinforcement and deepening of Port 201-203 was completed 5. Peninggian Perkuatan dan Pendalaman Dermaga 208-209 Konstruksi, progres Konstruksi selesai Construction of port 208-208’s elevation, reinforcement and deepening was completed 6. Peninggian, perkuatan, dan pendalaman Dermaga 109-110 dalam konstruksi, progress 94,94 Port 109-110’s elevation, reinforcement and deepening were still under construction with progress of 94.94 7. Perkuatan dan Pendalaman Dermaga 106- 107 dalam konstruksi 78,59 Port 106-107’s reinforcement and deepening were still under construction with progress of 78.59 8. Peningkatan dan Perkuatan Dermaga 301-302 tahap pelaksanaan dengan progress selesai 100 Construction of Port 301-302’s elevation and reinforcement was completed 100 9. Pendalaman Kolam Dermaga Eks. Dermaga Presiden dalam tahap persiapan pelaksanaan dengan progress 3,12 Deepening of ponds in former President Port was under implementation preparation with progress of 3.12 TPK Tanjung Priok 10. Perkuatan dan Pendalaman Dermaga 004 Utara SID selesai Reinforcement and deepening of Port 004 North of SID were completed 11. Perkuatan dan Pendalalaman dermaga 209L, 210-211 proses pelaksanaan 52,14 Reinforcement and deepening of Port 209L, 210- 211 were under construction with progress of 52.14 PJG Panjang 1. Perbaikan berat Dermaga BPort B Heavy Recovery and 2. AsuransiInsurance 1. Dermaga B : Selesai 100 Port B was completed 100 2. Telah dilakukan pembaruan polis renewal insurance policy has been made PJG Panjang MANAJEMEN RISIKO | RISK MANAGEMENT 317 IPC in Brief Company Profile Management Discussion Analysis On Company Performance Corporate Governance IPC • Laporan Tahunan 2014 Annual Report 3. Risiko Kerusakan Dermaga 3. Wharf Damage Risk