Cabang Cabang Cabang FINAL AR IPC 2014 Rev24Juli15

323 IPC in Brief Company Profile Management Discussion Analysis On Company Performance Corporate Governance IPC • Laporan Tahunan 2014 Annual Report Pemantauan Risiko Investasi Investment Risk Monitoring No. Investasi Investment Risiko Utama | Primary Risk Rencana Mitigasi Mitigation Plan Realisasi | Realization 3. Cabang Branch : Tanjung Priok Penjelasan Description : Pekerjaan Supply daya listrik termasuk tambahan daya dan jaringan ke kapal pelanggan di dermaga Pelabuhan Tanjung Priok berikut SID dan Supervisi Work on electricity supply capacity including additional supply and network installation to Tanjung Priok Wharf with SID and supervision Tidak sesuainya spesiikasi yang dipersyaratkan di RKS unsuitable speciication as required in terms and condition Menggunakan jasa konsultan pengawas To use monitoring consultant Menunjuk jasa konsultan pengawas untuk ketepatan pemilihan barang dan mengawasi ketepatan waktu kontraktor pelaksanaan pekerjaan. Progress isik tercapai 100 Dipecah menjadi pekerjaan GIS Priok, biaya penyambungan listrik, dan shore power Appointment of monitoring consultant service to guarantee procurement selection and supervise timely work implementation. Physical progress 100 divided into GIS priok work, cost of electricity installment and shore power

4. Cabang

Branch : Pontianak Penjelasan Description : Pengadaan 4 empat unit RMGC termasuk Desain dan Supervisi Procurement of 4 four units RMGC including deisng and supervision Kondisi di lapangan belum siap tidak sesuai dengan saat perencanaan alat Field condition was not readynot suitable to equipment plan Pembangunan jalur RMGC di CY 06 Cabang Pelabuhan Pontianak Construction RMGC channel in CY 06 branch Pontianak Port Pekerjaan pembangunan jalur RMGC, selesai pekerjaan 100 Construction RMGC channel was completed 100

5. Cabang

Branch : Tanjung Priok Penjelasan Description : Pengadaan 4 empat unit RTGC termasuk SID dan Supervisi di Pelabuhan Tanjung Priok Procurement of 4 four units of RTGC including SID and supervision in Tanjung Priok Port Kondisi di lapangan belum siap tidak sesuai dengan saat perencanaan alat Field condition was not readyunsuitable with equipment plan Pengembangan dan perkuatan lapangan serta pembangunan jalur untuk RTGC To develop and reinforce yard and to construct lane for RTGC • Telah dilakukan perkuatan Lapangan dan Pembangunan Jalur RTGC Reinforcement yard and construction lane RTGC was completed

6. Cabang

Branch : Kantor Pusat Headquaters Penjelasan Description : Pengadaan dan Implementasi Software Port Wide Solution Container Terminal Operating System, Car Terminal Operating System, Warehouse Management System Procurement and implementation of Port Wide Solution software Container Terminal Operating System, Car Terminal Operating System, Warehouse Management System Penyelesaian pekerjaan tidak tepat waktu Work was not completed on time Melakukan koordinasi dengan ILCS terkait dengan pelaksanaan pekerjaan tersebut To coordinate with related ILCS to do the work Selalu melakukan koordinasi dengan ILCS terkait dengan progres pekerjaan. Progress pekerjaan 44,45 Coordination with related ILCS was carried out. Work progress: 44.45 324 Sekilas IPC Profil Perusahaan Analisa Pembahasan Manajemen Atas Kinerja Perusahaan Tata Kelola Perusahaan IPC • Laporan Tahunan 2014 Annual Report Pemantauan Risiko Investasi Investment Risk Monitoring No. Investasi Investment Risiko Utama | Primary Risk Rencana Mitigasi Mitigation Plan Realisasi | Realization 7. Cabang Branch