KESEPAKATAN KONTRAK MINYAK DAN GAS BUMI lanjutan KESEPAKATAN KONTRAK MINYAK DAN GAS BUMI lanjutan KESEPAKATAN KONTRAK MINYAK DAN GAS BUMI lanjutan WILAYAH KERJA PANAS BUMI GEOTHERMAL WORKING AREAS AUDIT PEMERINTAH GOVERNMENT AUDIT

PERTAMINA | Laporan Tahunan - Annual Report 2011 492 PT PERTAMINA PERSERO DAN ENTITAS ANAKAND SUBSIDIARIES Lampiran 5206 Schedule CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN 31 DESEMBER 2011 DAN 2010 DAN 1 JANUARI 2010 Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2011 AND 201 0 AND 1 JANUARY 2010 Expressed in millions of Rupiah, unless otherwise stated

43. KESEPAKATAN KONTRAK MINYAK DAN GAS BUMI lanjutan

43. OIL AND

GAS CONTRACT ARRANGEMENTS continued

d. Perjanjian kerjasama PHE dengan pihak-

pihak lain adalah sebagai berikut lanjutan: d. PHE’s co-operation agreements with other parties are as follows continued: x Pertamina Participating Interests PPI x Pertamina Participating Interests PPI Sejak tahun 2008, dalam kesepakatan PPI, PHE mempunyai kepemilikan di dalam kontrak yang serupa dengan kontrak JOB-PSC. Sisa kepemilikan dimiliki oleh para kontraktor yang bertindak sebagai operator. Kewajiban pembiayaan bagian PHE dapat dilakukan secara langsung oleh PHE, atau dapat pula ditanggung lebih dahulu oleh para kontraktor dan akan dibayar oleh PHE dengan cara pemotongan bagian PHE atas produksi minyak mentah dan gas bumi, ditambah dengan 50 uplift. Produksi minyak mentah dan gas bumi dibagi antara PHE dan kontraktor berdasarkan masing-masing persentase partisipasi di KKS. Bagian kontraktor atas produksi minyak mentah dan gas bumi ditentukan dengan cara yang sama seperti KKS. Pada tanggal 31 Desember 2011, kerjasama PPI PHE adalah sebagai berikut: Effective in 2008, through PPI arrangements, PHE owns working interests in contracts similar to JOB-PSC contracts. The remaining working interests are owned by the contractors which act as the operators. PHE’s share of expenses is either funded by PHE on a current basis, or paid in advance by the contractors and repaid by PHE out of PHE’s share of crude oil and natural gas production, with a 50 uplift. The crude oil and natural gas production is divided between PHE and the contractors based on their respective percentages of participation in the PSC. The contractors’ share of crude oil and natural gas production is determined in the same manner as in the PSC. As of 31 December 2011, PHE’s PPI partnership arrangements are as follows: Mitra Usaha PPI PPI Partner Wilayah Kerja Working Area Area Tanggal Efektif Kontrak Effective Date of Contract Tanggal Mulai Produksi Production Commencement Date Tanggal Jatuh Tempo Kontrak Expiry Date of Contract Persentase Partisipasi Percentage of Participation Produksi Production Periode Kontrak Contract Period ConocoPhillips South Jambi Ltd. Petrochina International Jambi B Ltd. Blok B B Block Jambi Selatan South Jambi 2611990 2692000 2512020 25 Minyak dan gas bumiOil and gas 30 tahun years Total EP Indonesia Inpex Tengah Ltd. Blok Tengah Tengah Block Kalimantan TimurEast Kalimantan 5101988 161990 4102018 50 Gas bumi gas 30 tahun years PERTAMINA | Laporan Tahunan - Annual Report 2011 493 PT PERTAMINA PERSERO DAN ENTITAS ANAKAND SUBSIDIARIES Lampiran 5207 Schedule CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN 31 DESEMBER 2011 DAN 2010 DAN 1 JANUARI 2010 Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2011 AND 201 0 AND 1 JANUARY 2010 Expressed in millions of Rupiah, unless otherwise stated

43. KESEPAKATAN KONTRAK MINYAK DAN GAS BUMI lanjutan

43. OIL AND

GAS CONTRACT ARRANGEMENTS continued

d. Perjanjian kerjasama PHE dengan pihak-

pihak lain adalah sebagai berikut lanjutan: d. PHE’s co-operation agreements with other parties are as follows continued: x Kepemilikan kontrak minyak dan gas di luar negeri x Foreign oil and gas contract interests Pada tanggal 31 Desember 2011, PHE dan Entitas Anak dari PHE memiliki secara langsung maupun secara tidak langsung kepemilikan pada kontrak minyak mentah dan gas bumi di luar negeri sebagai berikut: As of 31 December 2011, PHE and PHE’s Subsidiaries directly and indirectly held foreign crude oil and natural gas interests as follows: Nama PBO Name of JOC Mitra Usaha PBO JOC Partners Wilayah Kerja Working Area Area Tanggal Efektif Kontrak Effective Date of Contract Tanggal Mulai Produksi Production Commencement Date Persentase Kepemilikan Percentage of Participation Produksi Production Periode Kontrak Contract Period Petronas Carigali Pertamina Petrovietnam Operating Company Sdn. Bhd “PCPP” Petronas Carigali Sdn. Bhd. Petrovietnam Offshore Sarawak Block SK 305 Malaysia 1662003 2672010 30 Minyak dan gas bumiOil and gas 29 tahun years Basker Manta Gummy “BMG” ROC Oil Pty. Ltd. Beach Petroleum Ltd. CIECO EP Australia Pty. Ltd. Sojitz Energy Australia Pty. Ltd. Anzon Australia Pty. Ltd. VicL26, VicL27, VicL28 Australia 30112005 382007 382007 Desember December 2006 10 10 10 MinyakOil License License License Blok ini merupakan Pengendalian Bersama Operasi “PBO” This block is Joint Operating Contract “JOC”

e. Kepemilikan secara langsung Perusahaan

pada KKS minyak dan gas di luar negeri e. The Company’s directly held foreign oil and gas PSC interests Perusahaan sebagai Badan Usaha Milik Negara mempunyai kepemilikan dalam KKS yang ditandatangani oleh Badan Usaha Milik Negara di negara-negara tertentu. Bagian Perusahaan atas produksi minyak dan gas ditentukan berdasarkan KKS. The Company, as a State-Owned Enterprise, owns working interests in PSCs entered into among State-Owned Enterprises in certain countries. The Company’s share of oil and gas production is determined in accordance with the respective PSCs. Pada tanggal 31 Desember 2011, Perusahaan memiliki secara langsung kepemilikan pada KKS atau kontrak sejenis minyak dan gas di luar negeri sebagai berikut: As of 31 December 2011, the Company’s directly held foreign oil and gas PSCs or similar interests are as follows: PERTAMINA | Laporan Tahunan - Annual Report 2011 494 PT PERTAMINA PERSERO DAN ENTITAS ANAKAND SUBSIDIARIES Lampiran 5208 Schedule CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN 31 DESEMBER 2011 DAN 2010 DAN 1 JANUARI 2010 Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2011 AND 201 0 AND 1 JANUARY 2010 Expressed in millions of Rupiah, unless otherwise stated

43. KESEPAKATAN KONTRAK MINYAK DAN GAS BUMI lanjutan

43. OIL AND

GAS CONTRACT ARRANGEMENTS continued

e. Kepemilikan secara langsung Perusahaan

pada KKS minyak dan gas di luar negeri lanjutan

e. The Company’s directly held foreign oil and

gas PSC interests continued Tanggal Tanggal Mulai Efektif Produksi Wilayah Kontrak Date of Persentase Periode Mitra Usaha Kerja Effective Commence Kepemilikan Kontrak Nama JOC JOC Working Negara Date of -ment of Percentage of Produksi Contract Name of JOC JOC Partners Area Country Contract Production Participation Production Period CONSON Joint Operating Company CONSON JOC Petronas Carigali Petrovietnam Offshore Block 10, 11 Vietnam Vietnam 812002 - 30 - 30 tahun years Coral Petroleum Operating Company Ltd. CNPC, Sudapet Dindir Petroleum, Africa Energy, Express Petroleum Gas Co. Ltd. Block 13, Sudan Sudan 2662007 - 15 - 20 tahun years Wintershall Holding GmbH Wintershall AG and Cosmo Energy ED Ltd. Block 3, State of Qatar Qatar 24102007 - 25 - 25 tahun years Pertamina EP Libya Ltd. - Block 123 Sirte onshore Libya 10122005 - 100 - Eksplorasi Exploration 5 tahun years Pertamina EP Libya Ltd. - Block 17- 3 Sabratah offshore Libya 10122005 - 100 - Eksplorasi Exploration 5 tahun years 44. WILAYAH KERJA PANAS BUMI 44. GEOTHERMAL WORKING AREAS Sejak tahun 1974, Pertamina Lama memperoleh wilayah-wilayah kerja panas bumi di Indonesia berdasarkan surat-surat keputusan dari Menteri Pertambangan dan Energi. Sesuai dengan PP No. 31 Tahun 2003, segala hak dan kewajiban, yang timbul dari kontrak dan perikatan antara Pertamina Lama dengan pihak ketiga, sepanjang tidak bertentangan dengan Undang-undang No. 22 Tahun 2001, beralih kepada Perusahaan sejak tanggal 17 September 2003. Perusahaan menyerahkan wilayah kerja panas bumi kepada PGE sejak tanggal 1 Januari 2007. Since 1974, the former Pertamina Entity was assigned geothermal working areas in Indonesia based on various decision letters issued by the Minister of Mines and Energy. In accordance with PP No. 31 Year 2003, all rights and obligations arising from contracts and agreements of the former Pertamina Entity with third parties, so long as these are not contrary to Law No. 22 Year 2001, were transferred to the Company effective as of 17 September 2003. The Company assigned its geothermal working areas to PGE effective as of 1 January 2007. PERTAMINA | Laporan Tahunan - Annual Report 2011 495 PT PERTAMINA PERSERO DAN ENTITAS ANAKAND SUBSIDIARIES Lampiran 5209 Schedule CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN 31 DESEMBER 2011 DAN 2010 DAN 1 JANUARI 2010 Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2011 AND 201 0 AND 1 JANUARY 2010 Expressed in millions of Rupiah, unless otherwise stated 44. WILAYAH KERJA PANAS BUMI lanjutan 44. GEOTHERMAL WORKING AREAS continued Pada tanggal 31 Desember 2011, wilayah kerja panas bumi PGE adalah sebagai berikut: As of 31 December 2011, PGE’s geothermal working areas are as follows: a. Operasi Sendiri a. Own Operations Wilayah Kerja Working Area LokasiLocation Status Lapangan Field Status OperatorContractor Sibayak-Sinabung Sibayak, Sumatera UtaraNorth Sumatera ProduksiProduction PT Pertamina Geothermal Energy Sungai Penuh Sungai Penuh, Jambi Pengembangan Development PT Pertamina Geothermal Energy Tambang Sawah- Hululais Hululais, Bengkulu Pengembangan Development PT Pertamina Geothermal Energy Lumut Balai Lumut Balai, Sumatera SelatanSouth Sumatera Pengembangan Development PT Pertamina Geothermal Energy Kamojang-Darajat Kamojang, Jawa Barat West Java ProduksiProduction PT Pertamina Geothermal Energy Karaha-Cakrabuana Karaha, Jawa Barat West Java Pengembangan Development PT Pertamina Geothermal Energy Iyang Argopuro Argopuro, Jawa Timur East Java EksplorasiExploration PT Pertamina Geothermal Energy Lahendong Lahendong, Sulawesi UtaraNorth Sulawesi ProduksiProduction PT Pertamina Geothermal Energy Kotamobagu Kotamobagu, Sulawesi UtaraNorth Sulawesi Pengembangan Development PT Pertamina Geothermal Energy Ulubelu Ulubelu, Lampung Pengembangan Development PT Pertamina Geothermal Energy

b. Kontrak Operasi Bersama KOB a.

Joint Operating Contracts JOCs Kontrak Operasi Bersama KOB meliputi kegiatan panas bumi di wilayah kerja PGE, yang dioperasikan oleh pihak ketiga. Berdasarkan KOB, PGE berhak mendapatkan production allowances dari kontraktor KOB yang besarnya 2,66 untuk KOB Darajat dan 4 untuk KOB Salak, Wayang Windu, Sarulla dan Bedugul, dari laba operasi bersih tahunan kontraktor KOB yang dihitung berdasarkan KOB. JOCs involve geothermal activities in PGE’s working areas that are conducted by third parties. In accordance with the JOCs, PGE is entitled to receive production allowances from the JOC contractors at the rate of 2.66 for the Darajat JOC and 4 for the Salak, Wayang Windu, Sarulla and Bedugul JOCs of the JOC contractors’ annual net operating income as calculated in accordance with the JOCs. Pada tanggal 31 Desember 2011, KOB PGE adalah sebagai berikut: As of 31 December 2011, PGE’s JOCs are as follows: Wilayah Kerja Working Area Lokasi Location Status Lapangan Field Status Operator Contractor Sibualbuali Sarulla, Sumatera UtaraNorth Sumatera Pengembangan Development PT Perusahaan Listrik Negara Persero Cibeureum - Parabakti Salak, Jawa Barat West Java Produksi Production Chevron Geothermal Salak Ltd Pangalengan Wayang Windu, Jawa BaratWest Java Produksi Production Star Energy Geothermal Wayang Windu Ltd Kamojang-Darajat Darajat, Jawa BaratWest Java Produksi Production Chevron Geothermal Indonesia Ltd TabananBedugul Bedugul, Bali Pengembangan Development Bali Energy Ltd Pendapatan PGE dari kegiatan panas bumi dikenakan pajak bagian pemerintah sebesar 34. PGE’s income from geothermal activities is subject to tax Government share at the rate of 34. PERTAMINA | Laporan Tahunan - Annual Report 2011 496 PT PERTAMINA PERSERO DAN ENTITAS ANAKAND SUBSIDIARIES Lampiran 5210 Schedule CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN 31 DESEMBER 2011 DAN 2010 DAN 1 JANUARI 2010 Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2011 AND 201 0 AND 1 JANUARY 2010 Expressed in millions of Rupiah, unless otherwise stated 45. AUDIT PEMERINTAH 45. GOVERNMENT AUDIT Perusahaan The Company Sesuai dengan Bagian 8.1 dan Pasal 3.2 Exhibit C dari Pertamina Petroleum Contract, Perusahaan memperhitungkan penyusutan atas aset minyak dan gas bumi yang sebelumnya dimiliki oleh Pertamina Lama sebagai recoverable costs untuk periode tanggal 17 September 2003 sampai dengan tanggal 16 September 2005. Seperti dijelaskan di dalam Catatan 17e, sesuai dengan Keputusan Menteri Keuangan No. 92KMK.062008 tanggal 2 Mei 2008, status atas aset yang sebelumnya dimiliki oleh Pertamina Lama yang tidak diakui di dalam neraca awal Perusahaan merupakan Barang Milik Negara BMN yang disewa Perusahaan sejak tanggal 17 September 2003 sampai dengan tanggal 16 September 2005. Oleh karena itu, koreksi atas dampak penyusutan atas aset yang sebelumnya dimasukkan sebagai recoverable costs oleh Perusahaan untuk periode tanggal 17 September 2003 sampai tanggal 16 September 2005 harus dilakukan. In accordance with Section 8.1 and Article 3.2 of the Exhibit C of the Pertamina Petroleum Contract, the Company included the depreciation of oil and gas assets owned by the former Pertamina Entity as recoverable costs for the period from 17 September 2003 through 16 September 2005. However, as disclosed in Note 17e, according to the Minister of Finance Decree No. 92KMK.062008 dated 2 May 2008, the status of assets previously owned by the former Pertamina Entity which were not recognised in the Company’s opening balance sheet represent state-owned assets BMN leased to the Company for the period from 17 September 2003 to 16 September 2005. Accordingly, adjustments were required to recognise the impact of the related depreciation of such assets previously claimed as recoverable costs by the Company in the period from 17 September 2003 through 16 September 2005. Hasil temuan audit oleh BPK, BPMIGAS dan BPKP atas cost recovery Perusahaan untuk periode 2003 sampai 2005 tidak termasuk biaya penyusutan aset yang sebelumnya dimiliki oleh Pertamina Lama pada tanggal 16 September 2003 dari recoverable costs, yang menyebabkan kenaikan bagi hasil Perusahaan dan Pemerintah atas produksi minyak dan gas dan kenaikan liabilitas pajak badan dan dividen Perusahaan. Perusahaan menerima hasil audit yang dilakukan oleh BPK, BPMIGAS dan BPKP sehubungan dengan isu tersebut di atas. BPK, BPMIGAS and BPKP audit findings for the Company for the period from 2003 through 2005 excluded the depreciation of the assets owned by the former Pertamina Entity as at 16 September 2003 from recoverable costs, resulting in an increase in the Company’s and the Government’s equity share of oil and gas production and an increase in corporate income and dividend tax payable by the Company. The Company has accepted the position as per BPK’s, BPMIGAS’s and BPKP’s audit findings in relation to this issue. Pada tanggal 31 Desember 2011, Perusahaan telah menyelesaikan liabilitas yang menjadi porsi Perusahaan kepada Pemerintah, kecuali penyelesaian temuan audit atas pajak penghasilan dan dividen Perusahaan sebesar US310.311.000 yang masih ditangguhkan menunggu hasil pengajuan banding Perusahaan atas lebih bayar pajak badan untuk periode sejak tanggal 17 September 2003 sampai dengan tanggal 31 Desember 2005. As at 31 December 2011, the Company has settled its portion of the liability to the Government, except for the settlement of the Company ’s corporate and dividend tax obligation based on the BPK’s audit finding of US310,311,000 which is pending the outcome of the Company’s appeal in relation to the overpayment of the Company’s corporate income tax for the period from 17 September 2003 through 31 December 2005. PERTAMINA | Laporan Tahunan - Annual Report 2011 497 PT PERTAMINA PERSERO DAN ENTITAS ANAKAND SUBSIDIARIES Lampiran 5211 Schedule CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN 31 DESEMBER 2011 DAN 2010 DAN 1 JANUARI 2010 Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2011 AND 201 0 AND 1 JANUARY 2010 Expressed in millions of Rupiah, unless otherwise stated 45. AUDIT PEMERINTAH lanjutan 45. GOVERNMENT AUDIT continued