w w
w .p
e rt
a mi
n a
.co m
359 358
L APO
R AN
T AH
U N
AN |
AN N
U AL
R EPO
R T
PER T
AMI N
A
2 1
Pt PERtAMINA PERSERO DAN ANAK PERUSAHAANAND SUBSIDIARIES Lampiran 5139 Schedule
cAtAtAN AtAS LAPORAN KEUANgAN KONSOLIDASIAN
31 DESEMBER 2010 DAN 2009 Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
31 DECEMBER 2010 AND 2009
Expressed in millions of Rupiah, unless otherwise stated
41. KESEPAKAtAN KONtRAK MINyAK DAN gAS BUMI lanjutan
41. OIL AND GAS CONTRACT ARRANGEMENTS
continued
b. Kontrak Kerjasama KKS Pt Pertamina EP
lanjutan b.
PT Pertamina EP’s Cooperation Contract
continued
Kontrak Kerja Sama Operasi KSO lanjutan
Cooperation Contracts KSO
continued
Mitra Usaha Partners
Wilayah Kerja Working Area
Area tanggal Efektif
Kontrak Effective
Date of Contract tanggal Akhir
Kontrak Date of End of
Contract tanggal Mulai
Produksi Commencement
of Production Produksi
Production
PT Indelberg Indonesia Perkasa
Suci Jawa Timur
East Java
2542007 2442027
- -
PT Kendal Oil and Gas Kendal
Jawa Tengah Central Java
2542007 2442027
- -
PT Kamundan Energy Kamundan
Papua 2542007
2442027 -
- PT Formasi Sumatera
Energy Tanjung Tiga
Timur Sumatera Selatan
South Sumatera 2542007
2442027 2542007
Minyak Oil
GEO Minergy Sungai Lilin Ltd.
Sungai Lilin Sumatera Selatan
South Sumatera 2542007
2442027 2542007
Minyak Oil
PT Geraldo Putra Mandiri
Ibul Tenggara Sumatera
2542007 2442027
2542007 Minyak
Oil Patina Group Ltd.
bangkudulis Kalimantan Timur
East Kalimantan 2542007
24420 27 -
- Pacific Oil Gas
Perlak Ltd. Perlak
Sumatera Utara North Sumatera
2542007 2442027
- -
PT Indrillco bakti Uno Dos Rayu
Sumatera Selatan South Sumatera
19122007 2442027
- -
PT benakat barat Petroleum
benakat barat Sumatera Selatan
South Sumatera 1632009
18122027 1632009
Minyak Oil
PT Petroenergi Utama Wiriagar
Wiriagar Papua barat
West Papua 292009
192024 -
- PT Santika Pendopo
Energy Talang Akar
Sumatera Selatan South Sumatera
05072010 472025
05072010 Minyak
Oil Cooper Energy
Sukananti Ltd. Tangai
Sukananti Sumatera Selatan
South Sumatera 26072010
2572025 26072010
Minyak Oil
Produksi dibawah NSO Production under NSO
Pada saat tanggal kontrak KSO berakhir, seluruh aset KSO diserahkan kepada
PT Pertamina EP. Mitra Usaha KSO bertanggung jawab untuk menyelesaikan
semua kewajiban KSO yang masih belum diselesaikan kepada pihak ketiga sampai
dengan tanggal tersebut. At
the end of KSO contracts, all KSO assets are
transferred to PT Pertamina EP. The KSO Partners are responsible for
settling all KSO’s outstanding liabilities to
third parties until the end of the KSO
contracts.
Pt PERtAMINA PERSERO DAN ANAK PERUSAHAANAND SUBSIDIARIES Lampiran 5140 Schedule
cAtAtAN AtAS LAPORAN KEUANgAN KONSOLIDASIAN
31 DESEMBER 2010 DAN 2009 Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
31 DECEMBER 2010 AND 2009
Expressed in millions of Rupiah, unless otherwise stated
41. KESEPAKAtAN KONtRAK MINyAK DAN gAS BUMI lanjutan
41. OIL AND GAS CONTRACT ARRANGEMENTS
continued
c. Joint Operating Body
- Enhanced Oil Recovery Contracts JOB-EOR
c. Joint
Operating Body
- Enhanced
Oil Recovery Contracts JOB- EOR
Dalam JOb-EOR,
kegiatan operasional
dilakukan oleh badan operasi bersama yang dikepalai oleh PT Pertamina EP dan dibantu
oleh Mitra
Usaha. Dalam
perjanjian ini
PT Pertamina EP dan Mitra Usaha memiliki participating interest sebesar 50 berbanding 50
50:50. Participating
interest milik
PT Pertamina
EP disebut
Pertamina Participating
Intere st ”PPI”
sedangkan participating interest milik Mitra Usaha disebut
Contractor Participating Interest
”CPI”. Dalam
JOb-EOR nilai
maksimum pengembalian biaya operasi adalah 65 dari
liftings hasil produksi CPI. Mitra Usaha berhak atas pengembalian biaya operasi dan
equity share
. Persentase bagi hasil produksi minyak dan gas bumi untuk Mitra Usaha adalah
masing-masing 28,8462 dan 57,6923. Under a JOB-EOR, operations are conducted by
a joint operating body headed up by PT Pertamina EP’s representatives and assisted by
the Partners. In this contract PT Pertamina EP and Partners have participating interest of 50
each 50:50. PT Pertamina EP’s participating interest is
called Pertamina Participating Interest PPI and the Partners’ participating interest
called Contractors’ Participating Interest CPI. The maximum value of cost recovery under a
JOB-EOR arrangement is 65 of liftings of CPI production. The Partners are entitled to recover
costs and a share of equity production. The Partners’ share of equity profit oil and gas
production is 28.8462 and 57.6923,
respectively. Pada saat kontrak JOb-EOR berakhir, seluruh
aset JOb-EOR
diserahkan kepada
PT Pertamina
EP. Mitra
Usaha JOb-EOR
bertanggungjawab untuk
menyelesaikan semua kewajiban JOb-EOR yang masih belum
diselesaikan kepada pihak ketiga sampai dengan tanggal tersebut.
At the end of JOB-EOR contracts, all JOB-EOR assets are transferred to PT Pertamina EP. The
JOB-EOR Partners are responsible for settling all
outstanding JOB-EOR liabilities to third parties until the end of the JOB-EOR contracts.
Pada tanggal 22 April 2009 kontrak JOb-EOR antara PT Pertamina EP dengan PT Lekom
Maras berakhir. PT Pertamina EP kemudian membentuk UbEP Adera untuk melanjutkan
kegiatan operasi di wilayah kerja tersebut. On 22 April 2009 the JOB-EOR contract
between PT Pertamina EP and PT Lekom
Maras was terminated. Subsequently, PT
Pertamina EP established UBEP Adera to continue the operation in such working area.
d. Perjanjian kerjasama Pt Pertamina Hulu
Energi
PHE dengan
pihak-pihak lain
adalah sebagai berikut: d.
PT Pertamina
Hulu Energi
PHE’s co-
operation agreements with other parties are as follows:
Indonesian Participation Arrangements IP
Indonesian Participation Arrangements IP
Melalui kesepakatan IP, PHE, sebagai anak perusahaan dari badan Usaha Milik
Negara, mendapatkan
tawaran untuk
memiliki 10 kepemilikan di KKS pada saat
pertama kali
Rencana Pengembangan
Plans of Development - POD
disetujui oleh
Pemerintah Indonesia, yang diwakili oleh bPMIGAS.
Kepemilikan di blok Jabung sebesar 14,28 karena Perusahaan menambah
kepemilikannya sebesar 4,28 dan untuk kepemilikan di blok Tengah sebesar 5
merupakan 10
dari kepemilikan
kontraktor sebesar
50. Perusahaan menyerahkan kepemilikan IP ini kepada
Anak Perusahaan PHE pada tanggal 1 Januari
2008. Pada
tanggal 31 Desember 2010, kemitraan Anak
Perusahaan PHE
melalui IP
adalah sebagai berikut:
Through IP arrangements, PHE, as a subsidiary of a State-Owned Enterprise, is
offered a 10 working interest in PSCs at the time the first Plans of Development
POD are approved by the Government of Indonesia, represented by BPMIGAS. The
interest in the Jabung Block of 14.28 reflects the acquisition of an additional
interest of 4.28 by the Company. The interes
t in the Tengah Block of 5 represents 10 of the Contractor’s interest
share of 50. The Company assigned these IP interests to PHE’s Subsidiaries on
1 January 2008. As of 31 December 2010, PHE’s
Subsidiaries’ IP
partnership arrangements are as follows:
w w
w .p
e rt
a mi
n a
.co m
361 360
L APO
R AN
T AH
U N
AN |
AN N
U AL
R EPO
R T
PER T
AMI N
A
2 1
Pt PERtAMINA PERSERO DAN ANAK PERUSAHAANAND SUBSIDIARIES Lampiran 5141 Schedule
cAtAtAN AtAS LAPORAN KEUANgAN KONSOLIDASIAN
31 DESEMBER 2010 DAN 2009 Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
31 DECEMBER 2010 AND 2009
Expressed in millions of Rupiah, unless otherwise stated
41. KESEPAKAtAN KONtRAK MINyAK DAN gAS BUMI lanjutan
41. OIL AND GAS CONTRACT ARRANGEMENTS
continued
d. Perjanjian kerjasama Pt Pertamina Hulu