Analisis dan Pembahasan Manajemen atas Kinerja Perusahaan Management’s Discussion Analysis
• Exploitation
In order to increase geothermal production in the working area of its own operation, PGE has completed drilling of 14
development wells 9 wells in Ulubelu, 3 wells in Lumutbalai and 2 wells in Lahendong.
Total production of geothermal steam during 2010 reached 67.06 million tons, consisting of: 15.96 million tons produced
by its own operation and 51.10 million tons of Joint Operations Contract JOC. The steam production exceeds target of
work plan. However, with the maintenance scheduling of production facilities, the realization of JOC production 2010
was slightly lower than the previous year.
Own operation KOB
Produksi Listrik GWh Electricity Production GWh
9,187.04
2009 2010
10,000.00 8,000.00
6,000.00 4,000.00
2,000.00 9,093.31
2,099.43 2,114.93
7,087.62 6,983.39
f. Gas Business • Gas Transportation
Gas Transportation in 2010 increased 1.7 when compared to the year 2009. The transportation of gas in 2009 was
recorded at 1,276 MMSCFD, while the igure in 2010 rose to 1,298 MMSCFD. However, if it was compared with the 2010
WPB, the realization igure decreased by 2 MMSCFD. One of the reasons the company fell short of its targets was the
gas from Pondok Tengah Field owned by Pertamina EP could not be distributed according to the target of 22 MMSCFD.
Actual distribution from ield only reached 7-8 MMSCFD.
e. Panas Bumi
Aktivitas panas bumi Pertamina dilaksanakan melalui pengusahaan sendiri dan pola kemitraan. Tiga area
Wilayah Kerja Pengusahaan WKP yang dikelola sendiri dan telah berproduksi, meliputi: area panas bumi Sibayak,
Sumatera Utara 12 MW, area panas bumi Kamojang, Jawa Barat 200 MW, dan area panas bumi Lahendong,
Sulawesi Utara 60 MW. Sedangkan Enam WKP lainnya dalam tahap eksplorasi dan pengembangan.
Pengembangan energi panas bumi melalui pola kemitraan dilakukan dalam bentuk Kerja Operasi Bersama KOB di area
Gunung Salak 375 MW, Wayang Windu 227 MW, dan Drajat 260 MW, serta
joint venture di daerah Dieng 60 MW. Sementara itu, dalam mengembangkan usaha PGE,
proyek-proyek baru selama 2010 telah diluncurkan, yaitu: Ulubelu unit 3 4 2x55 MW, Lumut Balai unit 3 4 2x55
MW, Kamojang Unit 5 1x30 MW, dan Karaha 1x30 MW berikut PLTP-nya total proyek. Di samping itu, PGE juga
melanjutkan proyek-proyek yang sedang berjalan yakni Ulubelu unit 1 2 2x55 MW, total proyek Lahendong unit
4 20 MW, total proyek Lahendong unit 5 6 2x20 MW, Lumut Balai unit 1 2 2x55 MW, total proyek Hululais
2x55 MW, total proyek Kotamobagu 2x20 MW, dan total proyek Sungai Penuh 55 MW.
• Eksplorasi
Sepanjang 2010 PGE telah menyelesaikan pengeboran eksplorasi panas bumi sebanyak 2 sumur, yaitu di
Lahendong 1 sumur LHD-25 dan di Kotamobago 1 sumur KTB-C1.
e. Geothermal
Pertamina’s geothermal activity is carried out through its own operation and partnership scheme. Three areas
of Commercial Work Area WKP, which are of its own operation and have been producing, include: Sibayak
geothermal area, North Sumatra 12 MW, Kamojang geothermal area, West Java 200 MW, and Lahendong
geothermal area, North Sulawesi 60 MW. While the other six WKP area are in exploration and development stage.
Geothermal energy development through partnership scheme is carried out in the form of Joint Operations Contract
JOC in the area of Mount Salak 375 MW, Wayang Windu 227 MW, and Drajat 260 MW, as well as a joint venture in
the area of Dieng 60 MW. Meanwhile, in developing the business PGE, new
projectshave been launched during 2010, namely: Ulubelu units 3 4 2x55 MW, Lumut Balai units 3 4 2x55 MW,
Kamojang Unit 5 1x30 MW, and Karaha 1x30 MW along with its geothermal power plant total project. In addition,
PGE also continues the projects in progress including Ulubelu units 1 2 2x55 MW, total project of Lahendong
Unit 4 20 MW, total project of Lahendong units 5 6 2x20 MW, Lumut Balai unit 1 2 2x55 MW, total project of
Hululais 2x55 MW, total project of Kotamobagu 2x20 MW, and total project of Sungai Penuh 55 MW.
• Exploration
Throughout 2010 PGE has completed exploration drilling of 2 geothermal wells, one at Lahendong 1 well LHD-25 and
another one at Kotamobago 1 well KTB-C1.
• Eksploitasi
Dalam rangka meningkatkan produksi panas bumi di wilayah kerja operasi sendiri, PGE telah menyelesaikan pengeboran
14 sumur pengembangan 9 sumur di Ulubelu, 3 sumur di Lumutbalai dan 2 sumur di Lahendong.
Total produksi uap panas bumi sepanjang 2010 mencapai 67,06 juta ton, terdiri dari: 15,96 juta ton hasil operasi
sendiri dan 51,10 juta ton hasil KOB. Hasil produksi uap melampaui target rencana kerja. Namun, adanya jadwal
pemeliharaan fasilitas produksi maka realisasi produksi KOB 2010 sedikit lebih rendah dari tahun sebelumnya.
Produksi Uap Juta Ton Steam Production Million Ton
2009 2010
80 60
40 20
68.02 67.06
15.77 15.96
Own operation KOB
52.29 51.10
f. Usaha Gas • Transportasi Gas
Transportasi Gas di tahun 2010 mengalami kenaikan 1,7 jika dibandingkan dengan tahun 2009. Jika di tahun 2009
transportasi gas tercatat pada angka 1.276 MMSCFD maka di tahun 2010 menjadi 1.298 MMSCFD. Namun jika
dibandingkan dengan RKAP 2010, angka realisasi tersebut mengalami penurunan 2 MMSCFD. Salah satu alasan
tidak tercapainya target karena gas dari Lapangan Pondok Tengah milik Pertamina EP belum dapat disalurkan sesuai
target sebesar 22 MMSCFD. Realisasi penyaluran dari lapangan tersebut baru mencapai 7-8 MMSCFD.
Volume Satuan
2009 2010
Transportasi Gas Gas Transportation
1,276 1,298
Pertamina EP MMSCFD
558 560
Non Pertamina EP 718
738
w w
w .p
e rt
a mi
n a
.co m
93
w w
w .p
e rt
a mi
n a
.co m
95 94
L APO
R AN
T AH
U N
AN |
AN N
U AL
R EPO
R T
PER T
AMI N
A
2 1
ANALISIS DAN PEmbAHASAN mANAJEmEN ATAS KINERJA PERUSAHAAN MANAGEMENT’S DIScuSSION ANAlYSIS
Analisis dan Pembahasan Manajemen atas Kinerja Perusahaan Management’s Discussion Analysis
• Niaga Gas Volume
Satuan 2009
2010 Niaga Gas
Gas Trading 5,120
5,595
GSIL Talisman BBTU
5,120 4,215
BBWM BBG -
1,380 Niaga Gas tahun 2010 mencapai 5,595 BBTU, mengalami
kenaikan 9.3 jika dibandingkan dengan realisasi di tahun 2009 yang angkanya sebesar 5,120 BBTU. Realisasi
Niaga Gas juga melampaui target RKAP 2010. Hal itu disebabkan oleh keberhasilan Pertamina Gas melakukan
kontrak baru untuk Perjanjian Jual Beli Gas PJBG pada bulan Agustus 2010, dengan PT Bayu Buana Gemilang
dan PT BBWM BUMD Kabupaten Bekasi. Dari kontrak tersebut Pertamina Gas mendapatkan realisasi niaga gas
sebesar 1,380 BBTU. Dengan tambahan kontrak tersebut nilai realisasi Niaga Gas 2010 lebih tinggi jika dibandingkan
dengan RKAP 2010.
g. Gas Metana Batubara
Selain geothermal, Pertamina juga telah mengembangkan
bisnis coal bed methane CBM atau GMB. CBM adalah
gas alam yang terjebak di dalam matriks batubara, sehingga memerlukan teknologi yang sedikit berbeda
dalam mengusahakannya dibanding pengusahaan gas bumi. Sampai akhir tahun 2010, Pertamina telah memiliki 6
anak perusahaan yang mengelola blok CBM. Keenam anak perusahaan tersebut adalah: 1 PHE Metana Kalimantan
A untuk mengelola blok Sangatta I, Kalimantan Timur; 2
• Gas Trading
Gas Trading in 2010 reached 5,595 BBTU, increased 9.3 when compared with the realization in 2009 amounted to
5,120 BBTU. Realization of Gas Trading also exceeded the target 2010 WPB. It is caused by the success of Pertamina
Gas in signing a new contract for Gas Sales Purchase Agreement SPA in August 2010, with PT Bayu Buana
Gemilang and PT BBWM a Bekasi Regency government- owned company. Of the contracts, Pertamina Gas would
get the realization of 1.380 BBTU of gas trading. With the addition of the contract, the realization of Gas Trading in
2010 exceeded the target in the 2010 WPB.
g. Coal Bed Methane